Carter Phase 1-CS100603
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
, being a residential replat of
Carter Addition, Lot 18R, Block 1, Replat
Lot 18, Block 1, to allow a reduction of the front building line from
50 feet to 30 feet and to grant a variance to the alley requirement
on 0.743 acres of property located at 509 East Bethel School Road,
at the request of Jennifer Dempsey, being represented by John
Margotta, Baird, Hampton & Brown.
STAFF REP.: Gary Sieb PROJECT ID# RP-10-0013
DRC DATE:
June 3, 2010
CONTACT:
Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works 972/304-3686
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1. Provide 4' of additional utility easement, for a total of 10 feet, at the rear of the property,
the neighbors will be installing a new sanitary sewer main to service the 2 new houses to the
west.
2. Verify the ROW dedication for Bethel School Rd.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
, being a residential replat of
Carter Addition, Lot 18R, Block 1, Replat
Lot 18, Block 1, to allow a reduction of the front building line from
50 feet to 30 feet and to grant a variance to the alley requirement
on 0.743 acres of property located at 509 East Bethel School Road,
at the request of Jennifer Dempsey, being represented by John
Margotta, Baird, Hampton & Brown.
STAFF REP.: Gary Sieb PROJECT ID# RP-10-0013
DRC DATE:
June 3, 2010
CONTACT:
Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works 972/304-3686
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1. No Comments