Loading...
Carter Phase 1-CS100603 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: , being a residential replat of Carter Addition, Lot 18R, Block 1, Replat Lot 18, Block 1, to allow a reduction of the front building line from 50 feet to 30 feet and to grant a variance to the alley requirement on 0.743 acres of property located at 509 East Bethel School Road, at the request of Jennifer Dempsey, being represented by John Margotta, Baird, Hampton & Brown. STAFF REP.: Gary Sieb PROJECT ID# RP-10-0013 DRC DATE: June 3, 2010 CONTACT: Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works 972/304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. Provide 4' of additional utility easement, for a total of 10 feet, at the rear of the property, the neighbors will be installing a new sanitary sewer main to service the 2 new houses to the west. 2. Verify the ROW dedication for Bethel School Rd. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: , being a residential replat of Carter Addition, Lot 18R, Block 1, Replat Lot 18, Block 1, to allow a reduction of the front building line from 50 feet to 30 feet and to grant a variance to the alley requirement on 0.743 acres of property located at 509 East Bethel School Road, at the request of Jennifer Dempsey, being represented by John Margotta, Baird, Hampton & Brown. STAFF REP.: Gary Sieb PROJECT ID# RP-10-0013 DRC DATE: June 3, 2010 CONTACT: Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works 972/304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. No Comments