Loading...
Lesley Retail (QT)-CS100603 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: , zoning change request from A (Agriculture) PD-237R-HC, QuikTrip to PD-237R-HC (Planned Development-237 Revised-Highway Commercial) to attach a detail site plan to allow a 4,900-square- foot convenience store with eight gas pump islands on 2.03 acres of land located at the northeast corner of South Belt Line Road and the proposed extension of Dividend Drive, at the request of QuikTrip, being represented by J.D. Dudley. STAFF REP.: Matt Steer PROJECT ID# PD-10-0012 DRC DATE: June 3, 2010 CONTACT: Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. Additional comments will be generated during engineering plan review. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: , zoning change request from A (Agriculture) PD-237R-HC, QuikTrip to PD-237R-HC (Planned Development-237 Revised-Highway Commercial) to attach a detail site plan to allow a 4,900-square- foot convenience store with eight gas pump islands on 2.03 acres of land located at the northeast corner of South Belt Line Road and the proposed extension of Dividend Drive, at the request of QuikTrip, being represented by J.D. Dudley. STAFF REP.: Matt Steer PROJECT ID# PD-10-0012 DRC DATE: June 3, 2010 CONTACT: Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. When is Dividend Dr. being built? 2. Who is “others”? 3. You will need a fire meter and vault 4. Double check the location of the proposed Sanitary Sewer connection. 5. There will be more comments during the detailed engineering plan review. 6. Glenn Engineering owes us as-builts on several projects, we will not release any permits or approve any plans until we receive them.