Loading...
Verizon-CS090205 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: GTE Shared Services Center Addition, Lot 1R1 and 1R2, Block 1, Replat, being a replat of the GTE Shared Services Center Addition, Lot 1, Block 1 to allow for separate ownership of each lot, requiring abandonment of existing fire lane and revisions to various utility easements on 23.4 acres of property located at the north east corner of S.H. 121 and Canyon Drive, being represented by Andy Shafer, Halff Associates. STAFF REP.: Matt Steer PROJECT ID# RP-09-0003 DRC DATE: January 29, 2009 - February 5, 2009 CONTACT: Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. Provide the city a copy of the sanitary sewer and mutual access agreements.