Loading...
ST1001-CS080721(7/27/2011) Keith Marvin -Royal Ln. /IH 635 Page 1 From: "Christopher Rocha" <CROCHA @dot.state.tx.us> To: "Keith Marvin" <kmarvin @ci.coppell.tx.us> Date: 7/21/2008 10:26 AM Subject: Royal Ln. /IH 635 Attachments: MEMORANDUM.tif Hi Keith, The attached scanned memo was sent to me from the Signal Section at the Dallas District of TxDOT. It contains their decision on the signal study and Royal Ln. and IH 635. If you can't open the file let me know and I'll try to send it to you another way. If there is anything else I can do for you feel free to contact me. Chris Rocha Engineering Assistant Dallas District NWAO crocha @dot. state. tx. us (972) 301 -4258 Fax: (972) 479 -1696 Texas !}apartment MEMORANDUM of rransportafron TO: Gary Bailey, P.E. July 16, 2008 Attn: Maurice Pittman, P.E. FROM: James K. Selman, P.E. SUBJECT: Signal Study Control: 2374 -07 -054 Highway: lH 635 at Royal Ln County: Dallas We received the requests from the cities of Coppell and Irving for a traffic signal at the intersection of IH 635 and Royal Lane. We concur that the existing traffic data supports a traffic signal, but we are not authorizing one at this time due to the existing geometry at the IH 635 westbound exit ramp to Royal Lane and the adjacent intersection of Royal Lane and Gateway Blvd. We will not install signals at one side of the interchange in the interim, Le, IH 635 eastbound exit ramp at Royal Lane, due to driver's expectancy. We will authorize and construct a traffic signal as part of the ramp realignment project. Please keep us informed on the status of this project. Feel free to contact Melanie Young, P.E. at 214 - 320 -6229 with any further questions. FRC: fc cc: Selman Traffic Oberlander /Young /Cortez TF