Loading...
Kimbel 7&8-CS080131 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-223R-C, Chase Bank (Kimbel Addition), zoning change request from PD-223-C (Planned Development-223-Commercial) to PD-223R-C (Planned Development-223 Revised-Commercial) to attach a Detail Site Plan to allow the development of a 3889-square-foot bank with three drive-thru lanes on 0.70 acres of property, located at the southeast corner of MacArthur Boulevard and Village Parkway at the request of Mathew Cragun, O’Donnell Engineering STAFF REP.: Marcie Diamond PROJECT ID# PD-07-0090 DRC DATE: January 31, 2008 - February 7, 2008 CONTACT: Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. Install stamped concrete in drive approach off of Village Parkway. 2. If lime stabilization is not going to be used for the paving, a waiver request must be submitted by the engineer along with the geotechnical report. 3. The retaining wall is in conflict with the sanitary sewer on the east side of the project. The engineered retaining wall design will need to be submitted to Engineering Department during the plan review process. 4. It appears that a full set of construction plans was submitted with the DRC information. These plans should not be considered submission for engineering approval. Plans for review should not be submitted until approval from Planning and/or City Council is granted.