Loading...
ST0502B-CS080529 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Freeport Parkway R.O.W. Dedication, Preliminary Plat Freeport and Parkway R.O.W. Dedication, Final Plat to provide the required right-of-way for the extension of Freeport Parkway, north of Sandy Lake Road to S.H. 121, at the request of Jack Evans, Pacheco Koch Consulting Engineers. STAFF REP.: Gary Sieb PROJECT ID# PP-08-0022 STAFF REP.: Gary Sieb PROJECT ID# FP-08-0023 (will be distributed under separate cover 5/27/08) DRC DATE: May 29, 2008 - June 5, 2008 CONTACT: Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686 FINAL REVISED COMMENT STATUS: PRELIMINARY AFTER P&Z Final Plat 1. The Metro PCS easement and tower will need to be relocated or abandoned. 2. What does the 25’ potential prescriptive ROW mean? Cause # 99-07200-2 County Court #5 provided ROW on Coppell Rd. (4-10-2000) 3. XS at the south portion of the ROW will need to be dimensioned. 4. The gas line and easement is in the Freeport ROW, it may be in conflict. What is in the 10X10 Lone Star Gas Easement, it will need to be moved or abandoned. 5. The ROW on the north end of Freeport Parkway does not match SH 121. The plans for SH 121 show 8 lanes and approximately 160’ of ROW transitioned from about 300’ Southeast of SH 121. Contact the Dallas District office for further information. 6. Corner clips will be needed on the south end of Freeport Parkway.