Loading...
CiCi's Addition-CS080605 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: CiCi’s Addition No. 1, Site Plan Amendment, to allow the construction of a 6,000-square-foot expansion along the north side of the existing office/warehouse building, on 5.14 acres of property located at 1080 W. Bethel Road, at the request of Brian Jaffe, Pacheco Koch Consulting Engineers. STAFF REP.: Gary Sieb PROJECT ID# SPR-08-0020 DRC DATE: May 29, 2008 - June 5, 2008 CONTACT: Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686 FINAL REVISED COMMENT STATUS: PRELIMINARY AFTER P&Z 1. The drainage will be evaluated further during engineering plan review. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Cici’s Addition No. 1, Lot 1R, Block 1, Replat, to revise the location of the fire lane to allow the expansion of the existing office/warehouse building on 5.14 acres of property located at 1080 W. Bethel Road, the request of Brian Jaffe, Pacheco Koch Consulting Engineers. STAFF REP.: Gary Sieb PROJECT ID# RP-08-0021 DRC DATE: May 29, 2008 - June 5, 2008 CONTACT: Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686 FINAL REVISED COMMENT STATUS: PRELIMINARY AFTER P&Z 1. No comment DEVELOPMENT REVIEW COMMITTEE