Bethel BP-CS070607
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
to allow the
Bethel Business Park, Lot 1, Block A, Site Plan,
development of two office warehouse buildings, Building A
containing 80,000-square-feet and Building B containing 82,650-
square-feet on 10.675 acres of property located along the north
side of Bethel Road, east of the proposed extension of Creekview
Road, at the request of Jim Pritchard, being represented by Matt
Goodwin, Goodwin and Marshall, Inc.
STAFF REP.: Matt Steer PROJECT ID# SPA-07-0045
DRC DATE:
May 31, 2007 and June 7, 2007
CONTACT:
Ken Griffin, P.E., Director of Engineering/Public Works 972-304-3686
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
No comments.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
, to establish a
Bethel Business Park, Lot 1, Block A, Minor Plat
building site, various easements and fire lane to allow for the
development of two office warehouse buildings, containing
80,000-square-feet and Building B containing 82,650 square feet
on 11.706 acres of property located along the north side of
Bethel Road, east of the proposed extension of Creekview
Road, at the request of Jim Pritchard, being represented by Matt
Goodwin, Goodwin and Marshall, Inc.
STAFF REP.: Matt Steer PROJECT ID# MP-07-0046
DRC DATE:
May 31, 2007 and June 7, 2007
CONTACT:
Ken Griffin, P.E., Director of Engineering/Public Works 972-304-3686
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1.Existing waterline along Bethel Rd is 16”, not 12”.
2.
Coordinate median opening with the Bethel Rd project.
3.
Show stamped concrete on driveway entrances.