Loading...
Bethel BP-CS070607 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: to allow the Bethel Business Park, Lot 1, Block A, Site Plan, development of two office warehouse buildings, Building A containing 80,000-square-feet and Building B containing 82,650- square-feet on 10.675 acres of property located along the north side of Bethel Road, east of the proposed extension of Creekview Road, at the request of Jim Pritchard, being represented by Matt Goodwin, Goodwin and Marshall, Inc. STAFF REP.: Matt Steer PROJECT ID# SPA-07-0045 DRC DATE: May 31, 2007 and June 7, 2007 CONTACT: Ken Griffin, P.E., Director of Engineering/Public Works 972-304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED  AFTER P&Z No comments. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: , to establish a Bethel Business Park, Lot 1, Block A, Minor Plat building site, various easements and fire lane to allow for the development of two office warehouse buildings, containing 80,000-square-feet and Building B containing 82,650 square feet on 11.706 acres of property located along the north side of Bethel Road, east of the proposed extension of Creekview Road, at the request of Jim Pritchard, being represented by Matt Goodwin, Goodwin and Marshall, Inc. STAFF REP.: Matt Steer PROJECT ID# MP-07-0046 DRC DATE: May 31, 2007 and June 7, 2007 CONTACT: Ken Griffin, P.E., Director of Engineering/Public Works 972-304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED  AFTER P&Z 1.Existing waterline along Bethel Rd is 16”, not 12”. 2. Coordinate median opening with the Bethel Rd project. 3. Show stamped concrete on driveway entrances.