Vista Ridge Retail 1A-CS071025 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-228R-HC, Vista Ridge Retail, Lot 1, Block A (Bank of America), zoning change request from PD-228-HC (Planned Development-228-Highway Commercial) to PD-228R-HC (Planned Development-228 Revised-Highway Commercial) to attach a Detail Site Plan to allow the development of a 4,400- square-foot bank with five drive-thru lanes on approximately 1.03 acres of property, located at the northeast corner of S.H. 121 and Denton Tap Road at the request of Joshua Griffith, Winkelmann & Associates, Inc. STAFF REP.: Gary Sieb PROJECT ID# PD-07-0082 DRC DATE: October 25, 2007 and November 1, 2007 CONTACT: Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. The 8” water crossing Denton Tap Rd. is shown in the wrong place. 2. The 12” water on the east side of Denton Tap Rd. has been abandoned. 3. Label the 27” sanitary sewer as Lewisville and show it to tie into the man hole on the North bound lane of Denton Tap Rd. 4. Show the lot lines clearly. 5. Tie the sanitary sewer service to the 12” Coppell Sewer not Lewisville’s 27”. 6. Double check detectors should be in the vault not in the buildings, unless specifically approved by the Fire Marshal. 7. Approval of the driveway and decel lane will be required from TxDOT. Decel lane should be constructed with this development. 8. When will the water lines for the future development be constructed? 9. Pro Rata for the 8” water line will be required. Council approved the Pro Rata Agreement on September 11, 2007 which requires a payment of $6298.03 per acre for this site to reimburse the developer who constructed the 8” water line that was offsite to their development. 10. A Property owner’s association agreement is required for maintenance of private utilities. 11. No drainage plans have been provided; drainage will be evaluated further during engineering plan review process. 12. Reconfigure domestic water so that it is not connected to the fire line. 13. Sidewalks along Denton Tap should be off of the back of curb. Include the construction of sidewalks along SH 121 service road.