Northpoint Addn-CS071227
ENGINEERING COMMENTS
ITEM:
Northpoint, Lot1R and Lot 2, Block 1, Replat,
being a replat of Lot 1, Block 1
of the Northpoint Addition, to allow the abandonment of various easements and
the dedication of a mutual access easement allowing for access to the development
on Lot 2 in the City of Grapevine on 16.13 acres of property, located east of S.H.
121 and south of Northpoint Drive, at the request of Robert Schneeberg, Gonzales
+ Schneeberg Engineers.
STAFF REP.: Gary Sieb PROJECT ID# RP-07-0089
DRC DATE:December 27, 2007 - January 3, 2008
CONTACT:
Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686
FINAL REVISED
COMMENT STATUS: PRELIMINARY
AFTER P&Z
1. No comments