Loading...
MA 09/10-CS101112 (8/2/2011) Keith Marvin - Re: New Sidewalk RequestPage 1 From: Keith Marvin To:Birdsall, Per CC:Adloo, Rhonda; Samaniego, Albert Date: 11/12/2010 3:31 PM Subject: Re: New Sidewalk Request To be honest, I thought we had already done that. We can add it to the sidewalk list if you want. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> Per Birdsall 11/12/2010 3:06 PM >>> I was contacted by Danielle Carlos the Association manager for Lake Park Subdivision. She has requested the connection of the sidewalk on both sides of the Glen Lakes intersection with MacArthur Blvd. My inspection of the location left me puzzled as to why either the developer or the homebuilder wasn't required to install these sections of sidewalk. Both sides combined would require about 100 feet of 4 foot sidewalk to make the connection. Take a look at these and let me know if I have missed something other than the meter can on the north side. I will take a look at wether we can afford to do this under the streets budget. Thanks, Per