Loading...
COS Lutheran-CS101001 (8/2/2011) Keith Marvin - Re: FW: Pre-construction Stakeholders MeetingPage 1 From: Keith Marvin To:Block, Stephen CC:Best, Larry; Odell, Richard; shuffman_rkm@yahoo.com; Whatley, Tom Date: 10/1/2010 4:34 PM Subject: Re: FW: Pre-construction Stakeholders Meeting Attachments:Church Property.pdf Mr. Block, I am writing concerning the City's plans for construction on Heartz Road here in Coppell. Construction will begin next week adjacent to land owned by your organization. I am including a PDF file with the pertinent plans for the area adjacent to your property. I would like to discuss two issues with you or your representative. First concerns the existing parking lot at the corner of Sandy Lake and Heartz. We plan to restrict on-street parking during the construction, and some of the neighbors inquired whether they could legally park in this lot during the construction. I am seeking permission for this activity on their behalf. As you can see from the plan we are also having to reconstruct a portion of this lot to accommodate grade changes as a result of this project. I am also seeking permission on behalf of the contractor for this activity. The city will ensure that the area is restored to the exiting condition, or better, at the end of the project. The second item concerns utility stub-outs to serve this lot. We are currently planning to stub two 8-inch water lines, and an 8" sewer line to this property to accommodate future development. I would like to coordinate these locations so they can be placed in the best location for you or any potential developers you may be currently negotiating with. Construction on this project will begin on Monday. Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> Larry Best <larry.best@verizon.net> 9/30/2010 8:34 PM >>> Steve, attached is a presentation that Keith Marvin, Project Engineer - City of Coppell, delivered tonight to our neighbors about construction on Heartz Road. In the meeting some residents asked Keith for permission to park in the concrete lot at 209 E. Sandy Lake Road. I have copied Keith on this message so he has your contact information. He will be calling you to discuss this request. Also, Keith has spoken with the person who you are in negotiations with over the sale of that property regarding utility stubs that will be provided as a part of this work. Please let me know if you have any questions. Lb P.S. Keith, Steve's other contact information is provided below: Executive Director, Stephen Block (8/2/2011) Keith Marvin - Re: FW: Pre-construction Stakeholders MeetingPage 2 Texas District Church Extension Fund 7900 East Highway 290 Austin, TX 78724-2499 512-926-4272 ------ Forwarded Message From: Keith Marvin <kmarvin@coppelltx.gov> Date: Thu, 30 Sep 2010 15:06:18 -0500 To: Larry Best <larry.best@verizon.net> Cc: Amaris Obregon <aobregon@manaraacademy.org> Subject: Re: Pre-construction Stakeholders Meeting Larry, Attached is the PowerPoint file for the meeting tonight. Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> Larry Best <larry.best@verizon.net> 9/27/2010 9:06 AM >>> Keith, we can have the tables setup. Also, just send the PowerPoint file when you are ready. Looking forward to a productive meeting. lb On 9/24/10 1:31 PM, "Keith Marvin" <kmarvin@coppelltx.gov> wrote: > Larry & Amaris, > > Thank you for your willingness to open your facility to us to host this > meeting. I think the ability to hold the meeting immediately adjacent to the > project will encourage greater attendance. This will also allow us to visit > with individual property owners to address their specific concerns on their > property rather than having to get back to them at a latter date. > > At this time, we plan to bring several people, two sets of plans for the > project, and an aerial photograph of the area with the new road layout > superimposed over it. We would appreciate a couple of tables to lay these > items out on. I will also prepare a brief PowerPoint presentation to > highlight some of the issues involved in the construction. > > I don't anticipate a very big turnout, however it will be nice to be prepared > just in case. > > I'll be in touch next week about the presentation. (8/2/2011) Keith Marvin - Re: FW: Pre-construction Stakeholders MeetingPage 3 > > Thanks again. > > Keith > > > > Keith Marvin, P.E. > Project Engineer > (972) 304-3681 > > > >>>> Larry Best <larry.best@verizon.net> 9/24/2010 1:04 PM >>> > Keith, I am with Christ Our Savior Lutheran Church on Heartz Road. Amaris > Obregon, principal of Manara Academy, gave me a copy of your letter inviting > interested parties to a meeting next week about construction on Heartz Road. > > The school and church want to make sure this meeting goes as smoothly as > possible for you and representatives from RKM Utility Services. We have > audio and video capabilities in the auditorium that can help you in > communicating your message more clearly. If you would like to project > PowerPoint slides or video footage, please send them to me ahead of time and > we will accommodate this need. Also, we will have microphones ready in case > there are so many attendees that audio support is useful. > > Amaris and I are discussing ways to make our guests most comfortable on this > evening. Please let us know if you have any special needs. > > Thanks for bringing together the neighborhood to share your plans. > > Larry Best, Congregation President > Christ Our Savior Lutheran Church > ------ End of Forwarded Message