Loading...
MA1009-CS110629 (3) Page 1 of 2 Keith Marvin - Re: Fwd: FW: alex canal From:Ken Griffin     To:John Elias;  Keith Marvin;  Michael Garza;  Per Birdsall     Date:6/29/2011 4:16 PM     Subject:Re: Fwd: FW: alex canal       Keith   I have a couple of questions: 1) Will they be performing any underwater surveying to ascertain the actual canal bottom conditions before they design a solution?  2) Will they be performing any testing during their design phase so assist them in footing design for a new wall?  Paragraph 3 under Basic Services seems to place the testing requirement on the city.   ken g >>> Keith Marvin 6/29/2011 3:40 PM >>> Attached is a proposed scope and fee for the Alex Canal project.  Please take a look at this and let me know your thoughts. Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Mark Holliday" <mholliday@tnp-online.com> 6/29/2011 9:45 AM >>> Good morning Keith. Attached is a draft contract proposal for the Alex Canal project for your review. Regarding the CAD services work, did you decide if it was to be a stand alone contract or amendment to the existing contract for those streets? Mark -----Original Message----- From: TNP [mailto:matkins@tnp-online.com] Sent: Wednesday, June 29, 2011 9:37 AM To: Mark Holliday file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4E0B4FECCity_o...8/5/2011 Page 2 of 2 Subject: alex canal Please open the attached document. This document was digitally sent to you using an HP Digital Sending device. file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4E0B4FECCity_o...8/5/2011