Loading...
ST0003-CS080415 (8/5/2011) Keith Marvin - Re: Coppell Rd projectPage 1 From: Keith Marvin To:Cole, Karl Date: 4/15/2008 1:50 PM Subject: Re: Coppell Rd project Karl, The one-way traffic will not start until June 9, or later depending on the work activity of the contractor. The storm drainage, water, and paving extend approximately 120 feet south of the intersection of Cooper Lane. While the east half of the roadway is being built we will have to transition northbound traffic to the west side of the road. The recommended length for this transition is 180 feet. Once work begins on the east half of the road the only turn allowed from Cooper Lane onto Coppell Road will be northbound. Thank you for bringing your concern to our attention. Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> Karl Cole <karlcolecfp@yahoo.com> 4/15/2008 12:10 PM >>> Keith, As one of the affected residents of this project, I was wondering if it were possible to make the beginning of the northbound traffic start right at Cooper Ln (at least until the construction gets to that point)? As I understand it now, we won't be able to turn south off of Cooper, right? Karl Cole 524 Lynn Ct. 972.393.3413 day