(8/8/2011) Keith Marvin - Re: Bethel Rd - TCP for Denton Tap/Bethel and Ph 2a & 2bPage 1
From: Keith Marvin
To:Dumke, Dean
CC:Entrekin, Kim; Murphy, Marty; Thornhill, Caleb
Date: 6/23/2010 5:16 PM
Subject: Re: Bethel Rd - TCP for Denton Tap/Bethel and Ph 2a & 2b
Dean,
These plans are very confusing. I would like to see them revised to reflect the actual limits of work and the sequence of
work. We also need an overall plan that shows the entire area, including detour routes.
We can meet here at the office to go over these, or you can revise and resubmit first.
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "Dean Dumke" <deand@JRJPaving.com> 6/22/2010 3:23 PM >>>
Keith,
Attached are the traffic control plans for the intersection work to be
performed on Denton Tap/Bethel Rd and TCP for when the bridge is
completed and traffic is switched to EB traffic only. Dallas Lite &
Barricade broke it down as 2a & 2b, but included the Denton Tap/Bethel
Rd intersection in these and I cannot separated them due to it being a
PDF document. Please let me know if you have any changes to this. My
thoughts it should be 2-way from west side of bridge once bridge is
open, with the EB only starting at either Penfolds or at 234 W Bethel.
Let me know what you think.
Thank you,
Dean Dumke
Sr Project Manager
469-223-7879
JRJ PAVING, L. P.