Loading...
Northlake 635(5)-CS110726 j i Pacheco Koch 1 DALLAS • FORT WORTH • HOUSTON July 26, 2011 PK No.: 1568 - 11.124 Mr. Michael Garza CITY OF COPPELL 255 Parkway Boulevard Coppell, Texas 75019 Re: COPPELL COMMERCE CENTER Lot 1R 2, Block D, Northlake Business Park Parking Expansion Coppell, Texas Dear Mr. Garza: This letter is to notify you that the enclosed Construction Plans have been revised in accordance with your July 15, 2011, Review Memorandum. The following items have been addressed as per the referenced review: GENERAL COMMENTS • We would prefer some sort of drainage swale on the adjacent property to accommodate the sheet flow to the drainage ditch along Beltline Road. Response: Request is noted, because of a conversation with the Owner the location of the existing trees and drainage swale were not added. • The Drainage Area Map shows that you are discharging 20.8 CFS into a proposed grade inlet. Where are you placing the storm drain system? Or is that future? Response: The storm drain system will be future and the runoff will flow to a proposed Y- inlet. SHEET C1.1 COMMENTS • Radius not reflected on west side of drive off Lakeshore drive. Response: Radius added to plans. • 2% cross slope needs to be achieved on drive off Lakeshore Drive within the public right -of -way. Response: Plans updated to reflect the request. • Drive dimension on east drive shows 25' width. Response: Dimension is to back of curb. Actual drive width from face of curb to face of curb is 24 feet. 8350 N CENTRAL EXPY • STE 1000 • DALLAS, TX 75206 1612 • (972) 235 -3031 • F (972) 235 -9544 • WWW.PKCE.COM Mr. Michael Garza July 26, 2011 Page 2 SHEET C3.1 COMMENTS • Note of concern with sheet flow onto adjacent property because lack of curb. Response: Item noted and rip rap added to help prevent erosion. SHEET C4.1 COMMENTS • No lighting shown on plan. Response: Light pole bases added to sheet C1.1 Site Lighting Sheet added to plans. • Hot poured rubber joint sealant not allowed in Coppell. Response: Joint sealant updated to reflect City of Coppell standards. • No stabilization called out on Detail 4. Response: Detail updated to reflect stabilization. • Parking and drive lanes show 5" paving. Response: No fire lanes are proposed on site, so paving is called out to reflect a thickness for auto traffic. • Full depth saw -cut is required not 1.5" as reflected on Note 6. Response: Note updated to call out full depth saw -cut. If you have any questions or need any additional information, please call at your earliest convenience. Sincerely, V 4( Gra on . Hughes, CFM CJS /vm 1568 -157 Pacheco Koch DALLAS • FORT WORTH • HOUSTON July 26, 2011 PK No.: 1568-11.124 Mr. Michael Garza CITY OF COPPELL 255 Parkway Boulevard Coppell, Texas 75019 Re: COPPELL COMMERCE CENTER 1234 Lakeside Coppell, Texas Dear Mr. Garza: Transmitted herewith, via courier service delivery, please find enclosed the following items for your review: No. Date Description 3 07/26/2011 24" x 36" Civil Set & Landscape Plans 1 07/26/2011 Comment Response Letter 1 07/05/2011 Original Set City Comments If the enclosures are not as noted above, please contact this office immediately. If you have any questions regarding the enclosed items or need any additional information, please call me at your convenience. Sincerely, /v Grayson K. Hughes, CFM GKH /vm 1568 -158 enc. cc: Jimmy W. Bright - Transwestern `" >Z. -✓'C- Q /.tit- ` t t 8350 N CENTRAL EXPY • STE 1000 • DALLAS, TX 75206 -1612 • (972) 235 -3031 • F 1972) 235 - 9544 • W W W.PKCE.COM