ST0301A-CS100714 (3)
(8/8/2011) Keith Marvin - Re: Bethel Rd - Traffic Signal LoopsPage 1
From:
Keith Marvin
To:
deand@JRJPaving.com
CC:
Martym@JRJPaving.com, johnny@melselectric.com, Per Birdsall, Glenn Hollo...
Date:
7/14/2010 2:16 PM
Subject:
Re: Bethel Rd - Traffic Signal Loops
Dean,
We are going to need to keep the detection operational for this intersection. Per and our traffic division
will assist in keeping this system in operation.
I'm in a meeting now, but we can talk about it this afternoon.
Keith
-----Original Message-----
From: "Dean Dumke" <deand@JRJPaving.com>
To: Keith Marvin <KMARVIN@coppelltx.gov>
Cc: Marty Murphy <Martym@JRJPaving.com>
Cc: Johnny Heine <johnny@melselectric.com>
Sent: 7/14/2010 2:02:48 PM
Subject: Bethel Rd - Traffic Signal Loops
Keith,
I have spoken with Mels electric regarding the traffic signal loops.
Johnny has spoken with Paring (sp) and they are checking their
inventory, but the situation is that I cannot saw this and jerry rig
something up so that the loops stay connected. As you know, there is
going to be excavation in this area and the loops just need to be
installed on recall. This may inconvenience some people, but it is what
has to be done in the mean time until a different solution is brought
forth.
Please help in assisting us in getting this resolved today. Every day
impacts this intersection in reaching ours and Coppell's goal in getting
this area opened back up.
Let me know what you think,
Dean Dumke
Sr Project Manager
469-223-7879
JRJ PAVING, L. P.
(8/8/2011) Keith Marvin - Re: Bethel Rd - Traffic Signal LoopsPage 2
_______________________