ST0301A-CS100729 (4)
(8/8/2011) Keith Marvin - Re: Bethel Rd - Oncor Street Light ConduitPage 1
From: Keith Marvin
To:Dumke, Dean; Heine, Johnny; Murphy, Marty
Date: 7/29/2010 2:50 PM
Subject: Re: Bethel Rd - Oncor Street Light Conduit
Dean,
We will handle this as a quantity adjustment. Please reflect this linear footage on your next pay request.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "Dean Dumke" <deand@JRJPaving.com> 7/28/2010 6:21 PM >>>
Johnny,
Per my meeting on site with Ronnie Free, Oncor, and Larry Davis, Coppell
Inspector, Oncor is to remove street light in center median of Denton
Tap, south of Bethel Rd and the necessary conduit to get the street
light conduit lowered and out of the pavement and stamped concrete area.
Mel's Electric has been approved to lower and extend the conduit out of
the way. Once this work has been performed, please send me the cost
associated with this work so that it can be sent to Coppell for payment.
If you have any questions pertaining to this please feel free to contact
me.
Thank you,
Dean Dumke
Sr Project Manager
#469-223-7879
JRJ PAVING, L. P.
_______________________