ST0301A-SP101208 (8/10/2011) Keith Marvin - Fwd: FW: Bethel Rd - Metal Beam Guard Rail SubmittalPage 1 From: Keith Marvin To:Birdsall, Per Date: 12/8/2010 1:55 PM Subject: Fwd: FW: Bethel Rd - Metal Beam Guard Rail Submittal Attachments:120810 MBGRail Sign Example Pic2.jpg; 120810 MBGRail Sign Example Pic1.jpg Per, Can you review the emails below and render an opinion? The gist of it is that our bridge designer has recommended a delinieator on the approach side of the new bridge on Bethel Road. Larry wants them to install an object marker instead. At the end of the project, I want them to have the appropriate sign so we don't have to go put something up ourselves. In reading the MUTCD, and reviewing the TXDOT detail sheets, it looks like either method could be used. Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Dean Dumke" <deand@JRJPaving.com> 12/8/2010 1:11 PM >>> Keith, Below are the approved requirements for the installation of the MBGRail at the 4 locations on the Bethel Rd project. The recommended delineator requested and installed is basically a metal post with 2 white reflectors on it. In speaking with Larry Davis on site, the attached picture is what he is wanting installed. This can be done and we can order and install the ones like in the picture, I just need to know if you are wanting this changed to the attached picture type and send me the revised specification so that I can get Dallas Lite & Barricade to proceed with this change. Thank you, Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________ (8/10/2011) Keith Marvin - Fwd: FW: Bethel Rd - Metal Beam Guard Rail SubmittalPage 2 ________________________________ From: Caleb Thornhill [mailto:bct@freese.com] Sent: Tuesday, November 16, 2010 12:01 PM To: Dean Dumke Cc: Keith Marvin; Marty Murphy; Kim Entrekin; CPL03243 Subject: RE: Bethel Rd - Metal Beam Guard Rail Submittal Dean, Here is FNI's recommendations: 1) N/E side -TL2 and Terminal Anchor Section (TAS). It's also recommended for a delineator (TxDOT item 658-2255 INSTL DEL ASSM (D-DW) SZ 2 (WC) GND) 2) S/E side - Terminal Anchor Section (TAS) only 3) N/W side - Terminal Anchor Section (TAS) only 4) S/W side - TL2 and Terminal Anchor Section (TAS). It's also recommended for a delineator (TxDOT item 658-2255 INSTL DEL ASSM (D-DW) SZ 2 (WC) GND) Please annotate these changes in the red lines. Any cost implications will need to be discussed directly with the city. Call me with any questions. B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214-217-2282 From: Dean Dumke [mailto:deand@JRJPaving.com] Sent: Monday, November 15, 2010 2:01 PM To: Keith Marvin; Caleb Thornhill Cc: Kim Entrekin; Marty Murphy Subject: Bethel Rd - Metel Beam Guard Rail Submittal (8/10/2011) Keith Marvin - Fwd: FW: Bethel Rd - Metal Beam Guard Rail SubmittalPage 3 Keith, Attached are the TXDOT specifications for the guard rail specified for this project. Is it required to have the specified guard rail on all four (4) corners of the bridge or on the opposite end to the bridge, in the direction of traffic flow would a certain distance with a turn-down be sufficient. Also, there are several items that seem to come into conflict at the designated areas and are noted as follows: 1) N/E side: 11' from the end point is a manhole that will be covered. 39' away is a high voltage box. 2) S/E side: 28' from end point is a utility pole. 3) N/W side: 44' from the end point is an electrical box. 4) S/W side: 3' from the end point is a fire hydrant. Some, if not all of the issues will have to be addressed prior to installation and will need a revised sheet if the distances change from what is on the current plan. Also, we will be pouring the end columns either Thursday or Friday this week and would like to see if the METAL BEAM GUARD FENCE TRANSITION (TL2) is the correct connection you want at the bridge so that the bolt pattern can be accounted for with the pour instead of having to core the holes at a later date. If you can review and get me the "okay to proceed" on this one item, I can have my guard rail installer get with North Texas Bridge, ASAP, in regards to the 4 locations and a template for the bolt pattern. Thank you, Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________