ST0301A-CN101220
(8/11/2011) Keith Marvin - Re: Bethel Rd - Pedestrian Indication & ButtonPage 1
From: Keith Marvin
To:Dumke, Dean
CC:Entrekin, Kim; Murphy, Marty
Date: 12/20/2010 9:56 AM
Subject: Re: Bethel Rd - Pedestrian Indication & Button
Dean,
Sheet TS-5 Shows to remove two PED signals and push button assemblies from poles T-9 and T-5, and to reinstall them on
poles T-7 and T-6. Pay item number 150 covers this work. It appears to me that poles T-9 and T-5 only had one set of
signals and push button assemblies per pole. Please provide a material cost to supply the required devices, as the
installation cost would be covered under item number 150.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "Dean Dumke" <deand@JRJPaving.com> 12/16/2010 6:34 PM >>>
Keith,
Please see attached RFI 023 regarding not having a pedestrian indication
and button for N/S crossing Bethel on the east side of Denton Tap.
Thank you,
Dean Dumke
Sr Project Manager
#469-223-7879
JRJ PAVING, L. P.
_______________________
JRJ PAVING, L. P.
_______________________
1805 Royal Lane, Suite 107
Dallas, Texas 75229
214-466-8340 Phone
214-466-8354 Fax
REQUEST FOR INFORMATION
Project:Bethel Road
RFI No:23
Date:December 16, 2010
Subject:Pedestrian Indication and Push Button
Reference Drawing:TS-5 page 54 of 80
INFORMATION REQUESTED:
1.In punching out the project I noticed that there was not a Pedestrian Indication and Push
Button for the persons crossing from the NW to the SW and the SW to the NW corners of
Denton Tap/Bethel Rd. I checking the plans there is nothing indicating this, but I would
think needs to be installed. In speaking with Mels Electric, they informed me of the
following:
The N/S crossing on the East side of the intersection did not have any existing pedestrian
facilities. Mels tech notified Traffic personnel that nothing was existing and that there was
not even a load switch in the cabinet for that phase; however, Mels did pull wire for the
PED facilities should the City desire to have them installed in the future.
Do I need to get a price to you to have these installed or will the City of Coppell install
these at a later date?
Requested by:
Dean Dumke
Sr Project Manager
deand@jrjpaving.com
Mobile: 469-223-7879