Loading...
ST0301A-CN101220 (8/11/2011) Keith Marvin - Re: Bethel Rd - Pedestrian Indication & ButtonPage 1 From: Keith Marvin To:Dumke, Dean CC:Entrekin, Kim; Murphy, Marty Date: 12/20/2010 9:56 AM Subject: Re: Bethel Rd - Pedestrian Indication & Button Dean, Sheet TS-5 Shows to remove two PED signals and push button assemblies from poles T-9 and T-5, and to reinstall them on poles T-7 and T-6. Pay item number 150 covers this work. It appears to me that poles T-9 and T-5 only had one set of signals and push button assemblies per pole. Please provide a material cost to supply the required devices, as the installation cost would be covered under item number 150. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Dean Dumke" <deand@JRJPaving.com> 12/16/2010 6:34 PM >>> Keith, Please see attached RFI 023 regarding not having a pedestrian indication and button for N/S crossing Bethel on the east side of Denton Tap. Thank you, Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________ JRJ PAVING, L. P. _______________________ 1805 Royal Lane, Suite 107 Dallas, Texas 75229 214-466-8340 Phone 214-466-8354 Fax REQUEST FOR INFORMATION Project:Bethel Road RFI No:23 Date:December 16, 2010 Subject:Pedestrian Indication and Push Button Reference Drawing:TS-5 page 54 of 80 INFORMATION REQUESTED: 1.In punching out the project I noticed that there was not a Pedestrian Indication and Push Button for the persons crossing from the NW to the SW and the SW to the NW corners of Denton Tap/Bethel Rd. I checking the plans there is nothing indicating this, but I would think needs to be installed. In speaking with Mels Electric, they informed me of the following: The N/S crossing on the East side of the intersection did not have any existing pedestrian facilities. Mels tech notified Traffic personnel that nothing was existing and that there was not even a load switch in the cabinet for that phase; however, Mels did pull wire for the PED facilities should the City desire to have them installed in the future. Do I need to get a price to you to have these installed or will the City of Coppell install these at a later date? Requested by: Dean Dumke Sr Project Manager deand@jrjpaving.com Mobile: 469-223-7879