Loading...
ST0301A-CS101221 (2) (8/11/2011) Keith Marvin - Re: Bethel Rd - MBGF Change Order & PED stuffPage 1 From: Keith Marvin To: deand@JRJPaving.com Date: 12/21/2010 5:35 PM Subject: Re: Bethel Rd - MBGF Change Order & PED stuff Sorry, that's what I meant. Please proceed with installation of the two additional pedestrian signals and push button assemblies. Keith -----Original Message----- From: "Dean Dumke" <deand@JRJPaving.com> To: Keith Marvin <KMARVIN@coppelltx.gov> Sent: 12/21/2010 5:32:46 PM Subject: RE: Bethel Rd - MBGF Change Order & PED stuff MBGF already installed. Can I proceed on the PED stuff, Change Order 20? Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________ -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Tuesday, December 21, 2010 5:30 PM To: Dean Dumke Subject: Re: Bethel Rd - MBGF Change Order Dean, Go ahead and get them ordered. We'll process a final change order with these last items on it. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Dean Dumke" <deand@JRJPaving.com> 12/21/2010 4:11 PM >>> Keith, Attached is the change order with the work performed on the site (8/11/2011) Keith Marvin - Re: Bethel Rd - MBGF Change Order & PED stuffPage 2 regarding to the installation of the revised MBGF. Items 1-4 is work performed and Items 5-6 are deleting out the original plan quantities. Thank you, Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________