ST0301A-CS101221 (2)
(8/11/2011) Keith Marvin - Re: Bethel Rd - MBGF Change Order & PED stuffPage 1
From:
Keith Marvin
To:
deand@JRJPaving.com
Date:
12/21/2010 5:35 PM
Subject:
Re: Bethel Rd - MBGF Change Order & PED stuff
Sorry, that's what I meant. Please proceed with installation of the two additional pedestrian signals and
push button assemblies.
Keith
-----Original Message-----
From: "Dean Dumke" <deand@JRJPaving.com>
To: Keith Marvin <KMARVIN@coppelltx.gov>
Sent: 12/21/2010 5:32:46 PM
Subject: RE: Bethel Rd - MBGF Change Order & PED stuff
MBGF already installed.
Can I proceed on the PED stuff, Change Order 20?
Dean Dumke
Sr Project Manager
#469-223-7879
JRJ PAVING, L. P.
_______________________
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Tuesday, December 21, 2010 5:30 PM
To: Dean Dumke
Subject: Re: Bethel Rd - MBGF Change Order
Dean,
Go ahead and get them ordered. We'll process a final change order with
these last items on it.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "Dean Dumke" <deand@JRJPaving.com> 12/21/2010 4:11 PM >>>
Keith,
Attached is the change order with the work performed on the site
(8/11/2011) Keith Marvin - Re: Bethel Rd - MBGF Change Order & PED stuffPage 2
regarding to the installation of the revised MBGF. Items 1-4 is work
performed and Items 5-6 are deleting out the original plan quantities.
Thank you,
Dean Dumke
Sr Project Manager
#469-223-7879
JRJ PAVING, L. P.
_______________________