Loading...
ST0301A-CN101222 Page 1 of 1 Keith Marvin - Bethel Rd - Slope fix From:   "Dean Dumke" <deand@JRJPaving.com> To:   "Keith Marvin" <kmarvin@coppelltx.gov> Date:   12/22/2010 11:19 AM Subject:   Bethel Rd - Slope fix Attachments:CO 122110 Ark Cont Quote BETHEL RD BRIDGE SHOTCRETE PROTECTION.doc; CO 122210 Bethel Road-Alexander Court Flume Wall Preliminary     Bid Proposal.pdf   Keith,   Attached are the 2 quotes I received to fix the slope at the NW corner of the Bridge where it has eroaded from the heavy rains.  (Ark Contracting & TRW)  If you approve one of these, I will then take the time to place in change order format with an additional 10% as we did with the other stone wall.   Please let me know which you want or what I need to do so that we can continue to move forward.  All indications are that we will be complete next Wednesday.  I will keep you informed.   Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________       file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4D11DEABCity...8/11/2011 ARK CONTRACTING SERVICES, LLC. 420 SOUTH DICK PRICE ROAD KENNEDALE, TEXAS 76060 OFFICE 817.478.7400 FAX 817.478.7438 December 20, 2010 JRJ Paving, Inc. Attention: Dean Dumke Re: Bethel Road Improvements City of Coppell, Texas Shotcrete Bridge Protection Thank you for the opportunity to work with you on the above referenced project. Please find enclosed our quote to install complete and in-place the following scope of work listed below, in accordance with the attached concept drawings, and the listed exclusions and clarifications as follows: Item No. Description Quantity Unit Price Amount 1 Mobilization 1 LS $7,500.00 $ 7,500.00 2 Excavation (Rock) 125 CY $ 35.00 $ 4,375.00 3 Soil Nails 18 EA $ 500.00 $ 9,000.00 4 Rock Nails 87 EA $ 350.00 $30,450.00 5 Shotcrete 1,999 SF $ 10.00 $19,990.00 6 Earth Fill 125 CY $ 22.00 $ 2,750.00 7 18 Inch Rock RipRap 145 CY $ 85.00 $12,325.00 12 Structural Engineering 1 LS $7,500.00 $ 7,500.00 TOTAL PROJECT COST $ 93,890.00 Exclusions and Clarifications: 1.This proposal is based upon performing all work with 1 each mobilization. 2.Ark Contracting Services, LLC shall furnish sealed engineered shop drawings prepared by a Professional Engineer registered in the State of Texas whom carries a minimum of $1,000,000 errors and omissions insurance. 3.Suitable access, testing, barricade, traffic control and erosion control by others. Page 1 of 2 Ark Contracting Services, LLC . 420 South Dick Price Road Kennedale, Texas 76060 12-20-2010 Bethel Road Bridge Gabion Protection City of Coppell, Texas Shotcrete Bridge Protection 4.No performance or payment bonds are included. Bonds can be furnished at cost 5.shall furnish valid certificates of insurance prior to Ark Contracting Services, LLC commencing work. 6.Monthly progress payments in the amount of (same percentage as per prime contract) for work completed and materials delivered. All payments shall be due within five (5) days of contractor’s receipt of payment. Payment to Ark Contracting Services, LLC. for retainage shall be due within five (5) days of contractor’s receipt of payment. 7. This quote is good for thirty days from the date of the proposal. Mark R. North Ark Contracting Services, LLC. Page 2 of 2