December 22, 2010
Dean Dumke
JRJ Paving, LP
1805 Royal Ln, Suite 107
Dallas TX 75229
RE: Project St 03 -10A Bethel Road (Denton Tap to Penfolds)
Dear: Me. Dumke
The City of Coppell has recently completed a walk -thru for the improvements in the referenced
project. Attached are items that must be addressed prior to final acceptance. NOTE: THIS IS
NOT A CONIPLETE PUNCH LIST.
Thank you for your cooperation during the construction of this project. If you have any questions,
please call me at (972) 304 -3684.
cc: Ken Griffin, P.E., Director of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Director of Public Works
Michael Arellano, Chief Building Official
Tim Oates, Fire Marshal
A FAMILY Cn M'vtUNITY FOR A LIFETIME
255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV
Fax: 972 - 304 -3570
Dec 21 10 11:58a City of Coppell 972 - 462 -5199 p.1
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To: Larry Davis, Construction inspector Engineering
From: Derrick Thomas, Street Department
Date: December 21, 2010
RE: 'Valk -thru Bethel Rd. from Denton Tap to Penfolds
1. From Penfolds toward Bethel Rd. OK.
2. From Penfolds toward Denton Tap:
a. Eastbound lane 3 cracks exist along three saw joints which are marked with
green paint.
b. Westbound lane 1 crack exists along side a saw joint which is marked with
green paint.
c. One in box contains residual concrete and needs to be cleaned. Box will be
marked with green paint.
C7TY OF COPPELL PUBLIC WORKS DEPARTMENT
Dec 21 10 12:29p City of Coppell 972 - 462 -5199 p.1
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To: Larry Davis, Construction Inspector Engineering
From: Brent Adams, Traffic Department
Date: December 21, 2010
RE: Walk -thru Denton Tap/Bethel Rd for Traffic
1. Pedestrian heads for the southbound direction — phase 2.
2. Place buttons around median noses on 2' centers on Denton Tap & Bethel.
3. Signs on Bethel Rd. have been installed as requested and are OK.
4. Bridge lights will be installed or on job site 12/22/10.
Cc: JRF Paving
Dean Dumke
CITY OF COPPELL PUBLIC JVORXS DEPARTMENT
Dec 22 10 11:31 a City of Coppell 972 - 462 -5199 p.1
T H E - C 1 T V O F
COFPELL
r o
e q
MEMORANDUM
TO: Larry Davis, Engineering
FROM: Ernest Powell, Public Works
DATE: December 21, 2010
REF: Bethel Road Project
Extensions on valve 1 & 2, east of bridge
Call 972 -462 -5150 to schedule a check of punch list items upon completion.