Keith,
Per our discussion before the Christmas Holidays, we spoke that I would
get you an update of the site during this week. Attached are the final
walk punch list items for both the City of Coppell and F &N.
I have walked the site this morning and all items on the Coppell punch
lists have been completed, minus the sidewalk forms needing striped that
were poured back last week. I will have this taken care of this week.
There are several F &N items no yet completed and the finishing painting
of the Ashlar Finish on the S Retaining Wall and the paint of the
Coppell Rail is also not complete. Due to the rain and weather
conditions, it does not seem that the F &N punch list items will be
completed this week. All remainder of the items are corrections needing
to be corrected by North Texas Bridge.
Also, I had previously sent you, 12/23/10, the change order for review
on the proposal for repairs to the NE corner of the bridge were erosion
has occurred. Is there a status on this getting approved or not? If
further discussion is needed, we can do so when you return.
I hope you and your families are enjoying the Holidays. I will speak
with you on January 3rd when you return to work.
Thank you,
Dean Dumke
Sr Project Manager
#469- 223 -7879
JRJ PAVING, L. P.
Dean Dumke
From: Caleb Thornhill [bct @freese.com]
Sent: Wednesday, December 22, 2010 3:27 PM
To: Keith Marvin
Cc: Peter Kau; Dean Dumke; Tony Diaz; CPL03243
Subject: FW:
Keith,
The following are the comments from our field visit yesterday. I'll have them put into a
more official format next week, but wanted to get them to you ASAP.
If you have any questions, contact Peter at 817 - 735 -7508.
B. Caleb Thornhill, P.E.
Freese & Nichols, Inc.
214 - 217- 2282 C QeS!z
1. No soil cover at footing for north retaining wall.
2. Waterstop missing at the first exp joint of south retaining wall, at the west side from
the west abutment.
3. Poor waterstop finish at multiple locations at south retaining wall.
4. Expansion joint at west abutment is leaking.
5. Some pipe hanger supports were not tighten, some of them are not providing support to
the pipe. C %rE�a jgr
6. At the south retaining wall, some of the weep holes are buried in the ground, some weep
holes are too close to the ground.
7. At the south retaining wall, a portion of the wall has the ground sloping towards the
wall, it is supposed to be sloping away from the wall. 6A.1-045 � AZO
8. Didn't see that any surface treatment, to the bridge, has been done.
9. At the east side of the bridge, one of the concrete blockouts between the concrete
riprap and bent column is not properly grouted.
10. The deck drain, without the metal pipe cast with the deck, water is running down the
cross slope and drip onto the beams . i) 4,, Jam , �,�; n Pc S G--1 %,.� P44,
Please consider the environment before printing this message.
This electronic mail message is intended exclusively for the individual or entity to. which
it is addressed. This message, together with any attachment, may contain the sender's
organization's confidential and privileged information. The recipient is hereby notified
to treat the information as confidential and privileged and to not disclose or use the
information except as authorized by sender's organization. Any unauthorized review,
printing, retention, copying, disclosure, distribution, retransmission, dissemination or
other use of, or taking of any action in reliance upon, this information by persons or
entities other than the intended recipient is prohibited. If you received this message in
error, please immediately contact the sender by reply email and delete all copies of the
material from any computer. Thank you for your cooperation.
r
1
T H E C 1 T Y • .0 F
. LL
s
December 22, 2010
Dean Dumke
3RJ Paving, LP
1805 Royal Ln, Suite 107
Dallas TX 75229
RE: Project St 03 -IOA Bethel Road (Menton Tap to.Penfolds)
Dear: Me. Dumke
The City of Coppell has 'recently completed a walk -thru for the 'improvements in the referenced
project. Attached are items that must be addressed prior to final acceptance. NOTE: THIS IS
NOT A COMPLETE P'UNCIR LIST.
Thank you for your cooperation during the construction of this project. If you have any questions,
please call me at (972) 304 -3684.
Fax: 972- 304 -3570
cc: Ken Griffin, P.E., Director of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Director of Public Works
Michael Arellano, Chief Building Official
Tim Oates, Fire Marshal
A FA f:J,1„Y 0MtS:U SV:.. T F0'R. A LA FETE NllE.
25.5 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972(462 002.2 * WWW.COPPELLTX.GOV
Dec 21 10 1 1:58a City of Coppell 972-462-5199 P,1
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To: Larry Davis, Construction fnspector Engineering
From: 'Derrick Thomas, Street Department
Date: December.21, 2010
RE: Walk-thru Bethel Rd. from Denton Tap to Penfolds
1. From Penfolds toward Bethel Rd. OIC
2. From Penfolds toward Denton Tap:
a. Eastbound lane 3 cracks exist along, three saw joints which are marked with
green paint
b. Westbound lane I crack exists along side a saw joint which is marked with
green paint.
c. One in box contains residual concrete and needs to .ire cleaned. Box will, be
marked with green.paint.
� A 5 MAi A
5 z [N.7
N
CITY OF COPPELL PUBLIC WORKS DEPARTAIENr
Dec 21 1012:29p City of Coppell
972-462-5199 PA
MEMORANDUM
FROM THE
WEPARTMENT OF PUBLIC WORKS
To.- Larry Davis, Construction Inspector Engineering
From: Brent Adams, Traffic Department
Date. December 21, 2010
RE: Walk-thru Denton Tap/Betbel Rd for Traffic
I. Pedestrian heads for the southbound direction —phase 2.
2. Place buttons around median noses on 2' centers on Denton Tap & Bethel.
3. Signs on Bethel Rd. have been installed as - requested and are OK.
4, Bridge lights will he installed or on job site Ul=ro.
Cc: JRF Paving
Dean Dumke
/
CITY OF COPPELL PUBVC Y10XKSDEPART4fENT
Dec 22 10 11:31 a City of Coppell
T H E - CI T Y O F
Cu"FP
a e
e e
TO:
Larry .Davis, Engineering
FROM:
Emest Powell, Public Works
DATE:.
December 21, 2010
RF,r:
Bethel Road Project
1. Extensions on valve 1 & 2, east of bridge 1'
972 - 462 - 5199 p.1
Call 972 -462 -5150 to schedule a check of punch list items upon completion.
�.�✓' ' 4 /' �`���� 4 DS 5 1 , L 1 7 0 - - ` 0z