ST0301A-CS101229 (8/11/2011) Keith Marvin - Re: Bethel Rd - Final Walk Punch OutPage 1 From: Keith Marvin To: deand@JRJPaving.com Date: 12/29/2010 10:18 AM Subject: Re: Bethel Rd - Final Walk Punch Out Thanks for the update. I have forwarded the erosion repair proposal to some folks for review and comment. I've not heard back yet. I had expected to see an option that included large diameter rock (18"-24") rather than the shot-crete. Did you gys talk about that at all? Was there a reason that would not work? I'll be back in town on Monday. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Dean Dumke" <deand@JRJPaving.com> 12/28/10 12:43 PM >>> Keith, Per our discussion before the Christmas Holidays, we spoke that I would get you an update of the site during this week. Attached are the final walk punch list items for both the City of Coppell and F&N. I have walked the site this morning and all items on the Coppell punch lists have been completed, minus the sidewalk forms needing striped that were poured back last week. I will have this taken care of this week. There are several F&N items no yet completed and the finishing painting of the Ashlar Finish on the S Retaining Wall and the paint of the Coppell Rail is also not complete. Due to the rain and weather conditions, it does not seem that the F&N punch list items will be completed this week. All remainder of the items are corrections needing to be corrected by North Texas Bridge. Also, I had previously sent you, 12/23/10, the change order for review on the proposal for repairs to the NE corner of the bridge were erosion has occurred. Is there a status on this getting approved or not? If further discussion is needed, we can do so when you return. I hope you and your families are enjoying the Holidays. I will speak with you on January 3rd when you return to work. Thank you, Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________ Page 1 of 1 Keith Marvin - Re: Fw: Bethel - NE corner erosion patch From:   Glenn Hollowell To:   Keith Marvin     Date:12/29/2010 12:15 PM     Subject:Re: Fw: Bethel - NE corner erosion patch   Keith,   I have never used it. I don't know too much about it. It looks pretty good and I have seen it used in other places but I really do not know enough about it to have an opinion.   Glenn file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4D1B2658City_...8/11/2011 Page 1 of 1 Keith Marvin - Re: Fw: Bethel - NE corner erosion patch From:   Per Birdsall To:   Keith Marvin     Date:12/30/2010 8:39 AM     Subject:Re: Fw: Bethel - NE corner erosion patch   I have no direct experience with the process but it seems to be effective though frequently not aesthetic.  Per >>> Keith Marvin 12/29/2010 10:19 AM >>> Anyone have an opinion on soil nails and shotcrete for slope protection? Keith file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4D1C452BCity_...8/11/2011