Loading...
ST0301A-CN110106 (8/12/2011) Keith Marvin - Bethel: Sod Quantity ResponsePage 1 From: "Dean Dumke" <deand@JRJPaving.com> To: "Keith Marvin" <kmarvin@coppelltx.gov> CC: "Caleb Thornhill" <bct@freese.com>, "Marty Murphy" <Martym@JRJPaving.com> Date: 1/6/2011 7:51 PM Subject: Bethel: Sod Quantity Response Attachments: RFI 024 Site Sod and Curlex Installation.xlsx Keith & Caleb, Please see attached RFI 024 regard the Site Sod and Curlex installation on this project. There seems to be a discrepancy with what was calculated on the initial plan "estimate of the necessary quantity" versus what is actually used on the project. JRJ is in the process of getting verification for the areas in which the sod and curlex were installed. Once these measurements have been received, a copy of the areas will be given to the COCoppell for payment for sod and curlex installed on this project. The project has 1845 linear feet of construction area, not including the intersection area. For example, if 1845 is taken and 10 foot of sod was installed on each side of roadway, the calculation comes to 4100 square yards, which blows the initial estimate of 2225 square yards out of the water. There are very few areas on this project in which sod or curlex was installed that was due to going outside job limits. I can assure you that with Larry Davis on site, me, the HOA Presidents and their respected subdivisions, Luis Parjes and Phil Berkebile, we did not go over our limits and if we did the area was minimal. JRJ and their subcontractors, along with the COCoppell and Freese & Nichols have provided a great looking product/job that we have all been complimented on by the Bethel Rd residents. As we always have done, JRJ will work on quantifying these areas and will get with you to go over once we do. Until we do so, I will only submit the bid quantity. Thank you, Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________ -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Thursday, January 06, 2011 8:09 AM To: Dean Dumke Cc: Caleb Thornhill Subject: Sod Quantity (8/12/2011) Keith Marvin - Bethel: Sod Quantity ResponsePage 2 Dean, I received your voice mail about sod quantity. Sod is one of those items that is specifically listed as a "Plans Quantity Item". Plans quantity items are paid at the amount listed in the bid schedule. This is essentially a lump sum item where the engineer has given you his estimate of the necessary quantity. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 JRJ PAVING, L. P. _______________________ 1805 Royal Lane, Suite 107 Dallas, Texas 75229 214-466-8340 Phone 214-466-8354 Fax REQUEST FOR INFORMATION Project:Bethel Road RFI No:24 Date:January 6, 2011 Subject:Project Sod Reference Drawing:All Sheets INFORMATION REQUESTED: 1.I have received Keith's email regarding the sod on this project and with all of the changes that were made on this project, JRJ feels that Freese & Nichols needs to relook at their "estimate of the necessary quantity" for this project. There have been trees that had to be removed, storm drain pipe, and additional items changed on this project that were not listed on the initial drawings. JRJ is requesting how his "estimate of the necessary quantity" was obtained and calculated. JRJ is in the process of quantifying the areas in which sod and curlex/seed locations were installed on this project. Requested by: Dean Dumke Sr Project Manager deand@jrjpaving.com Mobile: 469-223-7879