Loading...
ST0301A-CS110208Page 1 of 1 Keith Marvin - Bethel Rd - Penfolds electrical connection From: "Dean Dumke" <deandgJRJPaving.com> To: "Keith Marvin" <kmarvin @coppelltx.gov >, "Joseph M. Altadonna" <joemaltadonna @yahoo.com >, "Marty Murphy" <Martym @JRJPaving.com >, "Tery Chapman" <terycgJRJPaving.com> Date: 2/8/2011 10:02 AM Subject: Bethel Rd - Penfolds electrical connection CC: "Johnny Heine" <johnny @melselectric.com >, "David Gonzales" <davidgmelselectric. com> Attachments: CO Fix Electrical at Reserve - Sketch.pdf Gentlemen: I would like to take the time to thank Keith, Larry, Joe, and Tery for taking the time to meet on site yesterday at 2:15pm to discuss getting power to the median of Penfolds. Attached is a sketch of the work to be performed that will make the necessary connections to the median area. Mels Electric is scheduled to be on site tomorrow starting between 9am to loam to check the street lights on the bridge and install the electrical connection at Penfolds. Mels will make the necessary connections and run 3/4" conduit from the connection on the east side of Penfolds, to the center median, install a junction box, and install 3/4" conduit from the junction box to the connection on the west side of Penfolds. At that time Mels will check to make sure that there is power to the median and to the connection on the west side of Penfolds. At our meeting on site yesterday, it was brought up that at the start of the project there was a tree at the SW corner of Penfolds that was scheduled to be removed and another tree that was falling on the screening wall and Rodney's garage area. It was discussed with Rodney that instead of removing the tree at the SW corner of Penfolds, JRJ would remove the tree that was falling on the screening wall and his garage area, but before JRJ would remove the tree, He /Reserve HOA needed to disconnect the wiring from the tree and turn off power so area was safe. The next day Rodney and I met and I was informed that this had been completed and we could proceed with this removal. The tree was removed and the wiring was left exposed at this location until it came to the final walk with City of Coppell which asked that the wiring be placed under grass area. The reason this is brought up is once the median and west side areas are hot, this area will also be hot and will need to be addressed, but is not a part of any work performed by JRJ or Mels Electric. Thank you, Dean Dumke Sr Project Manager #469- 223 -7879 JRJ PAVING, L. P. file: / /C: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4D5114ADCity_... 8/15/2011 N V QWfR POLE I LOT 2 J I REMOVED BY 07HE �\ RU S REMOVE TREE BRICK / COLUMN' TONNA REMOVE EXISTING INLET . I< �'��� 3.91 BETHEL ROAD ESTATES VOL. 2000134, PG. 2875, D.R.D.C.T. ADJUST EXISTINC MANHOLE TO L+(( �JW / R MATCH EX AT CURB INLET.7 ' B N N VOL. 20 CAUTION... 1. CONTRACTOR TO PROTECT WALLS, TREES, LANDSCAPING 230 BETHEL ROAD PROPOSED GRADE. I d =7'f2 8" (SEE W 239 EXISTING UNDERGROUND UT7LD7ES 48 CONTROL POINT fi II � � POWER POLES TO BE R =660. ' L =83 ' CONTRACT IN AREA. CONTACT UTILITIES HOURS PRIOR TO CONSTRUCTION £= 2,428,862.02 ° 36" RELOCATED BY DINERS 18" ELM �_ - L62 — - REM VERIZON: 972 - 578 -3345 ADJUST EXISTING ^ n OA' •'D" r" p01 ( ° - 61- EDAR ELMS PROP. RET WALL AND ONCOR ELECTRIC: 2T4- 406 -424 4tANHOLE TO S" OAIC'{ PROPOSED GRADE., o OAK ��i` } O r 2 0 '� 12" F.LM o L- r% SEE SHEET DT -1 ATMOS GAS 972 - 233 -253 e � C 1 0.41 -� -- - - I -- N 1/2" ON I6" ELN -t 500 91 14" 0 r J $ 14" OAK ROD FOUPI 6" HACK 14' ELM - �S 10" CEDAR EL - CABLE -TV ASH - X ray ! _rut } ,ry Hf_A JALL II F — f�PP P '4 .41 E I E � 'G 1 o Sr ti 4 Ca W \ 14 LM T/7 — — - ��E�CpAR _ E " /� ' — E10 _- _ E 7 — ` - - E �� �. , — _ i 0 EX. 16" WTER �fi .LT E ROAD EX. WA _1 -- -- _ �aSl � �SIdH 1,607.47' s ,5 IH - - ASPHALT TELEPHO E 7p —� EX . 12" JS /i— EX. 12 _� - m -- W (n ,PP '74 "R(-P COIdCREI — — —H —�i/� _ _ ROAD NE W M 141 i .R RM DRAIN PI (n Z - - 5M- r W - I FUTURE SIDEWALK- _m_��_ 15" OAK c --,�__ N V QWfR POLE I �, I' J I REMOVED BY 07HE �\ RU S REMOVE TREE BRICK / COLUMN' REMOVE EXISTING INLET . I< �'��� 3.91 ROCK IN LL 51 27. 2 / I MATCH EX AT CURB INLET.7 ' B N N NOTE: r - 7,,033,500.62 1. CONTRACTOR TO PROTECT WALLS, TREES, LANDSCAPING £=2,428,862,82 STING AND IRRIGATION AT THE RESERVE SUBDIVISION, iolT O RICK COLUMN l DAMAGED LANDSCAPING SHALL BE RESTORED TO TOE E DISTURBED PRECONSTRUCTION CONDITIONS. SHEET A -4) (SEE W 1 2. BARRIER FREE RAMPS WILL BE CONSTRUCTED AT / / C ' DRIVEWAYS AND STREETS AS SHOWN IN PLANS. 3. FUTURE SIDEWALKS SHOWN FOR CLARITY ONLY. THEY WILL BE CONSTRUCTED AS PART OF A FUTURE CONTRACT — - I EJEV = 498.4 rn — -- ate 500 1 1 1 - 495 ° SPRV'.t� SPR.v "Y' I ILET 13 DAh ELI1 SPRV EX. 16" WA r" CEDAR ELM — Ll CRAPE_ �� f o 13" ELM 8" CEDAR ELM 93 'WV 4 \(OMH(O 9 Rfi RFA�6Qo �� ;<k 'K CK 9N�� /OtFT a `�I RAPE PK NAIL' .93' Zg3 T "lE (>CI I/ IRON` � ° F01 ND 28,75' 6 1 _ COLUMN ROD FOUND REMOVE EX. F,r 10" CEDAR ELM AND Ek VALVE - SAWCUT & MATCH STA 38 +75.53 k ELM EXISTING PAVEMENT INSTALL BENCHMAR 1- 16X6 TAPPING SLEEVE c 1 -6' VALVE I -FH PT STATION OFFSET NO NOR B.M. 1 BOX UT 7M TOP OF MEDIAN CURB 91 36 +87.88 22.00' LT 7,033 SE T THE INTERSECTION L 5 LF 6" PIPE 92 39+80.59 22.00' LT 7,033 r 8£TH ROAD AND PENFOLOS LANE 93 39+08.24 23.00' RT 7,033 APPRO IMATELY 30 FEET SOUTH OF 94 37+10.37 60,13' RT 7,033 BETHEL OAO. 95 36+35.17 14.00' RT 7,033 ELEVAAON = 49701 96 36 +35.17 9.50' RT 7,033 m -- _ _m_��_ --,�__ a = Wim_�■.■ -_m___ ___ _ -�____ _�_� �� ®__�_ __ ___ _ C__ _I -- _oma _ 0 C _ 0EM I== m ___mmmm, I m � �:ME ME _ _ ___�__� ____ . ,