Loading...
ST0301A-CS110212 Page 1 of 1 Keith Marvin - Bethel Rd - Penfolds electrical update From:   "Dean Dumke" <deand@JRJPaving.com> To:"Keith Marvin" <kmarvin@coppelltx.gov>, "Joseph M. Altadonna"     <joemaltadonna@yahoo.com>, "Marty Murphy" <Martym@JRJPaving.com> Date:   2/12/2011 9:53 AM Subject:   Bethel Rd - Penfolds electrical update   Gentlemen:   Yesterday Mels electric was on site to begin installation of electrical connection to the Penfolds median.  Due to not having a locator, Mels did not make connection on the east side.  Once this was found out, I contacted both Joe & Keith regarding this and informed them that the east side connection would be made on Monday afternoon.  Since my conversation with them, I was contacted by Mels and informed that they will be getting the locator equipment and finish the connection today.  I will be in contact with Mels and be on site today to make sure this work is performed.   Also, yesterday in meeting Larry Davis, Coppell Inspector, Lee, Coppell Building Inspector, and Mels rep on site it was discussed that one box be installed in median and one box installed on the west side of Penfolds.  Due to the area in which the tree was removed and the electrical disconnected, it would be a safety hazard if the electrical was connected on the west side.  Mels is going to make sure that there is power to center median box and to west side box, but not make the connection to the wires going to the west of the box due to safety, but once the electrical has been reconnected where tree was removed, an electrician will be able to got to the west side box and make necessary connections in the future.  Keith and Joe were both made aware of what was discussed in this paragraph.   Thank you,   Dean Dumke Sr Project Manager 469-223-7879 JRJ PAVING, L. P. _______________________     file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4D5658B4City_...8/15/2011