ST8805-CS 881109Dallas, Texas 75251 '1~F,~5'5 6;J3
214/233-5771
JP No. 88009; Denton Tap Road Median
Breaks; Parks of Coppell; Coppe11, Texas
RE:
Dear Mike:
We received the Concept Plan for the Town Center Site from Hodges
& Associates on October 27, 1988. I have provided my client, ABQ
Development Corporation, a copy of this plan and discussed the
proposed location of the two median openings south of Parkway
Boulevard shown on the Concept Plan with Jay Chester of ABQ.
Although no dimensions are indicated on the Concept Plan, we used
the scale indicated (1"-100') to determine roadway stations on
Denton Tap Road for the median openings shown. The following
table gives our locations of median openings scaled from the
Hodges' plan and a comparision to the locations we proposed in my
letter to you of July 26, 1988.
DENTON TAP ROAD STATIONING OF CENTERLINE
OF PROPOSED MEDIAN OPENINGS
HODGES LOCATION
JPCE LOCATION
186+98 186+98
182+44 182+70
177+68 178+15'
NOTES
1st opening south of
Parkway Blvd.
2nd opening south of
Parkway Blvd.
Mills Lane Intersection
* Obtained from Ginn, Inc. per plans prepared for Denton Tap Road
Improvements.
These stations are based on a centerline station of Denton Tap
Road at the Parkway Boulevard intersection of 191+13. You may
wish to discuss apparent discrepencies with regards to the Mills
Lane median opening with Ginn, Inc.
6001 W. Interstate 20, Suite 209, LB 32 · Arlington, Texas 76016 · Metro 1817J 572-3458 · (817J 561-2108
Mr. Mike Allen
JP No. 88009
November 8, 1988
'Page 2 of 2
From our review of Hodges' plan, we are in agreement on the
location of the first median opening south of Parkway Boulevard.
Hodges' has located the centerline of the second median opening
approximately 26 feet south of the median opening we had
proposed. In addition, median openings proposed by Hodges appear
to be 75 feet wide. We had proposed 60 foot wide openings in my
correspondence to you of July 26, 1988.
ABQ Development Corporation agrees to the centerline locations of
the two proposed median openings in Denton Tap Road shown on the
Concept Plan for the Univest property prepared by Hodges &
Associates as defined in the table above. ABQ requires, however,
that ABQ and Univest equally participate in the cost of a 60 foot
wide median opening and that costs for construction of that
portion of the median opening in excess of 60 feet are the
responsibility of Univest Development Company, if you desire 75
foot wide openings.
In response to your letter to me of October 10, 1988, ABQ wishes
to include the construction of the left turn lanes that will
permit access to ABQ property with the median openings in Denton
Tap Road. ABQ understands that Univest Development Company has
elected not to request construction of left turn lanes to access
Univest property at this time.
Please request your engineer or architect to advise us if they
concur with the centerline location of the median openings as
reported under the column headed "Hodges Location" in the table
above and if the median openings should be 75 feet wide. Upon
receipt of this information, we will furnish sketches of the
agreed median opening locations, and left turn lanes to ABQ
property, to the City of Coppell. Please provide this
information to us by November 23, 1988.
Please contact Jay Chester of, ABQ
regarding preparation of agreements
construction and any specific issues you wish to
yOU ·
Sincerely, //~
erry Parche' , P.E.
Development Corporation
regarding the subject
discuss. Thank
JP:ch
cc: Jay Chester, P.E./ABQ Development Corporation
Russell Doyle, P.E./City of Coppell