Loading...
ST8505-AG 881213SUbmISSION DEADLINE: 5:0C~%m. Monday Effective 1/20/88 - 8 Days Preceding ~.y Council Meeting AGENDA REQUEST FORM FOR CITY COUNCIL MEETING: December 13, 1988 I. REF/FILE NI.R. IBER : J-255 II. ITEM CAPTION Fnr the ~elt I,ine Road fSouth) l~provement project and authorizing ~.mmn C~tvCotmcil's approval, : Discussion and consideration of ,Ch~nge~Order No, Six (6)~.~' III. ACTION RECOMMENDED IV. REP. IN ATTENDANCE A: Russell VI. NOTIFICATION TO METHOD OF CONTACT : DATE : B: OTHER - :, n/a DINTS. itY. m~ineer P.E.', Pr°jedt Engineer (Ginn Inc.) FINANCIAL REVIEW : 1. BUDGETED ITEM 2. BUDGET AMOUNT 3. ESTIMATED AMOUNT FOR THI~ ITEM 4. AMOUNT ~UNDER BUDGET 5. LOW BIDDER RECOMMENDED SOURCE OF FUNDING CO'S OR BONDS FUNDS : XXX YES NO..-[; : $329,869.74!, (Series or year OPERATING BUDGET ( OTHER APPROVED AGENDA REQUEST FORM DMEMO! CITY MANAGER'S COMMENTS/RECOMMENDATION FOR AGENDA ITEM I. Item #23 City Council Agenda Dated: 12-13-88 II. COMMENTS/RECOMMENDATION: At a prior City Council meeting we reviewed plans for landscaping of the parkway along Beltline. The question was asked as to the maintenance of this landscaped area. Staff has prepared an estimate indicating two levels of maintenance. Class A: Class C: Similar to the parkway median maintenance in front of the Town Center. Similar to the MacArthur Boulevard median at Woodridge. $24,000 $14,000 $10,000 As you can see there is an estimated $10,000 per year cost differential between the two levels of maintenance. In either case we will have to hire additional staff maintain this median. to GINN, INC. CONSI!LTING ENGINEERS December 5, 1988 Mr. Russell Doyle, P.E. City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Belt Line Road (South) ~provements Change Order No. Six (6) - Lighting, Landscaping & Irrigation Coppell, TX Dear Mr. Doyle: Please find Change Order No. Six (6) enclosed for the above referenced project. This Change Order deals with landscaping and irrigation for the medians and for the parkway along North lake and also includes some street lighting. We respectfully request this ~item be placed on the December 13, 1988 council agenda for their 'consideration. As you may recall, in early fall we made a presentation to the City Council requesting direction on these issues. The result of their decision on these issues is reflected in Change Order No. Six (6). Due to the detailed effort required by the Contractor for this work over the original landscape plan, there is an increase in the landscaping category by approximately $16,000. We ~eel that this additional $16,000 is reasonable compensation for'that effort. Also, the street light foundations were not an original line item in Ed Bell Construction Company's contract with the City so this results in an additional contract amount of ~pproximately $25,000 to cover this item. Normally, TU Electric would install these foundations when the street lights are installed, but due to the amount of landscaping and irrigation being installed, it was (1) cheaper for Ed Bell Construction Co. to do this work than it was to use TU Electric (by approx. $150.00/fnd. @ 49 fnd's results in savings of $7,350.00) and (2) this will prevent excessive damage to the landscaping and irrigation system in the future whenever the remainder of the street lights are installed (recall only the intersections shall be lit at this time). The decision by Council to not light the whole street right now was due to a savings in operating costs of approximately $8,500.00/year that can be realized by the City if only the intersections are lit at this time. While Change Order No. Six (6) results in increases for some items, the overall project is still well within the original budget. Attached is a tabulated summary of the approximate Belt Line Road (South) budget and costs to date. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/2484900 Since funds are available at this time, we recommend approval of Change Order No. Six (6). We anticipate work could get started immediately after the holidays, in January 1989, which is an excellent time to perform this type of work. Please call if you have any questions. Sincerely, Kevin Peiffe~/~./~/E. KP/dsp cc: H. Wayne Ginn, P.E. File 255 ITEM BUDGET CIP $3,660,000 Dallas Co. $700,000 Certificates · of Oblig. $2,100,000 Total $6,460,000 Budget (interest not included in figure) ITEM COSTS TO DATE Original Construction Total Change Orders No.'s 2-4 Engineering & Inspection Total Obligated Cost to Date Change Order #6 $5,540,642.41 (42,967.03) $590,000.00 $6,087,675.38 $42,454.88 Total Estimated Project Cost $6,130,130.26 Net Surplus $329,869.74 (interest not included in figure) Note: Change Order No.'s 1 and 5 are not included in the above figures since appropriate funds were escrowed with the City by Connell Development Co. and St. Louis Southwestern Railroad, respectively, for this work. ~ C! IANGE OIH)ER ~ (Inslructions on reverse side) No. Six (6) Belt Line Road (South) Improvements Pl~t ()J ECT: ()WNF, R: City of Coppell P.O. Box 478 (Name, Address) Coppell, TX 75019 CONTI(ACTOR: Ed Bell Construction Co. CONTRACT FOR: Belt Line Road Improvements DATE OF ISSUANCE: December 13, 1988 OWNER's Project No. F. NGINF, ER: Ginn, Inc. (Kevin Peiffer, ENGINEER's Project No. 255 P.E.) . Yot! are dircclcd Itl make the following changes in the Conlracl Documents. Descriplion: Landscape, irrigation and street light foundations for the Belt Line Road (South) medians and lake frontage I'urposeofCha,,gcOrdc,': City Council's desire for this segment of roadway to comply with City's streetscape standards and thus provide an attractive gateway to the City. Attachments: (I.isl docunlenls supporling changd) Item List CIIANGE IN CONTI(ACT PRICE: Original Contract Price $ S,540,642.41 Previous Change Orders No. one ., No, $ 205:859.30 Conl,'act Price prior lo Ihis Change Order 5,746,501.71 Net Increase (~irtg~rt~ of this Change Order $ 42,454.88 Contract Price with all approved Change Orders $ 5,788,956.59 five CIIANGE IN CONTRACT TIME: Original Contract Time S40 calendar days days or dale Net change from previous Change Orders 30 calendar'days days Contract Time Prior Icl this Challge Order S70 calendar days (Subst. completion date was Sept. 2! lqaR; TSmo qtoppod on contract) · .... days or dale Net Increase (41:~EII~) of_tiffs Chapge Ordel 84 calendar days (from date 0t notice to proceed with work) dayb this Conlract Time with' '~'lpp,'oved Chan§e.Order: 84 calendar days RECOMM ENDED: [{JCI)C No. 1910-8-11 { 1983 Edition} A I'PRO V E D: by Prepared by thc I!.gmecrs' Joint ('OllllilCt I)*,c.menls ('ommiltcc alld cmlolsed by Thc Asstvciated (iencral ('ontract~,r.~ of America: CHANGE ORDER NO. SIX (6) BELT LINE ROAD (J-255) ITEMS TO BE ADDED TO CONTRACT ITEM DESCRIPTION APPROX. UNIT UNITS OUANTITY PRICE Mobilization & Cleanup LS Sub-Totals Mobil. & Clean-up = LANDSCAPING Red Crepe Myrtle, 8'-10' high EA 20 137.50 Pink Crepe Myrtle, 6'-8' high EA 63 137.50 White Crepe Myrtle, 6'-8' high EA 102 137.50 Dwf Crepe Myrtle, 5 gallon size EA AMOUNT $41,400.00 Cedar Elm, 3" caliper EA Bald Cypress, 3" caliper EA Prairie Flame Sumac, 6'-8' high EA $41,400.00 Aromatic Sumac, 5'-8' high EA 2,750.00 10 White Althaea, 4'-6' high EA 8,662.50 11 Pink Althaea, 4'-6' high EA 14,025.00 12 Rusty Viburnun, 6'-8' high EA 220 19.80 4,356.00 70 297.00 20,790.00 8 297.00 2,376.00 13 Mexican Buckeye, 6'-8' high EA 9 143.00 14 Mexican Plum, 6'-8' high EA 8 ~ 143.00 15 Soap Berry, 8'-10' high EA 1,287.00 16 Soap Berry, 6'-8' high EA 1,144.00 2 165.00 330.00 2 165.00 330.00 2 220.00 440.00 7 154.00 1,078.00 9 137.50 1,237.50 2 33.00 66.00 6 33.00 198.00 ITEM 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 DESCRIPTION Red Bud, 6'-8' high Eve's Necklace, 8'-10' high Eve's Necklace 6'-8' high Roughleaf Dogwood, 6'-8' high Carolina Buckthorn, 6'-8' high Wrights Acacia, 6'-8' high Mesquite, 2.5" caliper Desert Willow, 6'-8' high Aristocrat Pear, 2" caliper Mealey Sage 5 gallon size No Item Desert Willow 5 gallon size Coyote Willow, 7 gallon size Trumpet Honeysuckle 5 gallon size Mesquite, 6'-8' high White Honeysuckle, 5 gallon size Dark Lance Amorpha, 5 gallon size Native Prairie Rose, 5 gallon size Trumpet Creeper, 5 gallon size UNITS EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA APPROX OTY. 12 4 3 4 3 8 42 7 87 6 52 13 136 UNIT PRICE 38.50 110.00 110.00 110.00 220.00 192.50 192.50 165.00 220.00 18.70 33.00 66.00 17.60 55.00 17.60 55.00 27.50 17.60 AMOUNT 462.00 330.00 440.00 330.00 880.00 577.50 1,540.00 495.00 1,760.00 785.40 297.00 462.00 1,531.20 330.00 915.20 495.00 357.50 2,393.60 ITEM 36 37 38 39 DESCRIPTION UNITS APPROX UNIT OUANTITY PRICE Ink Berry, 5 gallon size EA AMOUNT Wax Myrtle, 5 gallon size EA 11 60.50 665.50 Aromatic Sumac, 5 gallon size EA 9 22.00 198.00 Staking, Mulch, Steel Edging, Topping Lump Sum 5 104.50 522.50 Sub-Total Landscaping = 10,958.20 $85,795.60 ELECTRICAL 40 Pole Foundations 41 Pull Boxes 42 Bore 2" Conduit 43 No Item EA 49 462.00 22,638.00 EA 3 156.00 468.00 LF 180 13.75 2,475.00 Sub-Total Electrical = $25,581.00 IRRIGATION 44 Irrigation System 52 Drip Irrigation along North lake frontage, complete Lump Sum Lump Sum Sub-Total Irrigation 66,340.23 2,712.05 69,052.28 Total Items Added = $221,828.88 to Contract (add su~-totals) ITEMS TO BE DELETED FROM CONTRACT ITEM DESCRIPTION 168 Sprinkle Irrigation 700.1 Cedar Elm Trees 700.2 Crape Myrtle Trees UNITS APPROX. OUANTITY UNIT PRICE MG 14,000 10.40 EA 190 132.60 EA 150 57.20 Total Items Deleted from Contract Total Increase in Contract ~unount AMOUNT 145,600.00 25,194.00 8,580.00 $(179,374.00) $42v454.88 COPPELL PUBLIC ~ORKS December 7, 1988 TO: FROM: Alan Ratliff, Steve Goram, City Manager Director of Public Work RE: South Beltline Rd Medians and Parkways Annual Maintenance Comparison The comparison of costs associated with the maintenance of this area based on two classifications or levels is attached. Please note the description of each type and frequency of service offered. Class A or Mode 1 - This is a state-of-the art level of maintenance which is indicative of areas which are high traffic areas, have a variety of features to-maintain and in an urban area. This is symbolized by governmental grounds, public squares or malls and highly visited parks. A high frequency of maintenance, some type performed, on a daily basis. Class C or Mode III - A moderate amount or level of maintenance afforded those areas of low level development, visitations or because of resources can't be more intensively maintained. SGG/sm cc: Richard Diano, Park Foreman Attachment Mowing Fertilizer Irrigation Pruning Litter Control Inspect Control Surfaces Clean Curb Inspection Class A/Mode I 1 Time per week @ $3,120.00/year 4 Times per year @ $1,292.00/yr Operations/Maintenance @ $5,480.00/yr Regular @ $2,500.00/yr 2 Times weekly @ $8,064.00/yr Regular @ $1,500.00/yr Class C/Mode III 1 Time every two weeks @ $1,560.00/yr 2 Times per year @ $646.00/year same $5,480.00/yr as needed @ $900.00/year 1 Time per week @ $4,549.0~/yr None; case by case Each Mowing and as necessary $1,256.00/yr Each mowing @ $800.00/yr 2 Times per week @ $980.00/yr 1 Time per week @ $494.00/yr Total Annual Maintenance: (A) $24,192.00 (C) $14,429.00 Examples of these categories would be Class A or Mode I Coppell Town Center and Class C or Mode III MacArthur Blvd median @ Woodridge