Loading...
ST8505-AG 880426 (2) S~BMISSION DEADLINE: 5:0-~-p.m. Monday ~ ~ev~: Effective 1/20/88 - 8 Days Preceding~ity Council Meeting REF/FILE NUMBER AGENDA REQUEST FORM FOR CITY COUNCIL MEETING: April 26~ 1988 : II. ITEM CAPTION : Discussion, consideration and approval of Chanqe Order No. Two (2), in the amount of $46,687.60; No. Three (3), in the amount of $22,267.59; and No. Four (4), in the amount of ($11i,92~.04).. for Beltline Road (N/S) Capital Improvement ~ro~ect and authorizing the Mayor to siqn. III. ACTION RECOMMENDED : Staff recommends a~roval. The net amount of these Chanqe Orders is a $42~.966,85 reduction in the contract ~rice. IV. REP. IN ATTENDANCE A: STAFF- B: OTHER - Kevin Peiffer, Ginn, Inc. V. NOTIFICATION TO VI. METHOD OF CONTACT : DATE : FINANCIAL REVIEW : 1. BUDGETED ITEM 2. BUDGET AMOUNT 3. ESTIMATED AMOUNT FOR THIS ITEM 4. AMOUNT OVER OR UNDER BUDGET 5. LOW BIDDER RECOMMENDED SOURCE OF FUNDING C0'S OR BONDS FUNDS (Series or year authorized) OPERATING BUDGET (Account Number) OTHER AGENDA REQUEST FORM DMEMOI APPROVED BY CITY MANAGER : ITEMNUMBER ~% : YES NO : : : : YES NO GINN, CONSULTING ENGINEERS MEMORANDUM TO: Alan D. Ratliff,/~ty ~anager FROM: Wayne Ginn, P.E.'~~ ~.~. ..... DATE: April 20, 1988 /~'f ' ~' SUBJECT: Belt Line Road (N/s) Change Order No's Two (2), Three (3) and Four (4) Enclosed please find the above referenced subject items which we are requesting be placed on the April 26, 1988 City Council agenda. The net result of the three Change Orders is a reduction of $42,966.85 to the total contract. The enclosed maps show the locations of the project that each respective Change Order is applicable to. Change Order No. Two (2) is an increase of $46,687.60 to the contract. This Change Order provides for the extension of six- lanes of concrete pavement from Hackberry Road south to IH-635 (400 foot segment). This additional paving will complete the necessary improvements at the south end of Belt Line Road. A temporary asphalt transition, rather than concrete pavement, was originally proposed at this location. The temporary asphalt design was originally included because the SDHPT had not yet determined where the future centerline of the IH-635 overpass was to be yet and thus, a permanent design could not be pursued yet. This question has since been resolved. Incidentally, this section of roadway was not included in the original street assessment program for Belt Line Rd. and thus, needs to be reviewed by the City Attorney as to how to proceed with a street assessment program for this segment. Change Order No. Three (3) is an increase of $22,267.59 to the contract. This Change Order provides for a smooth pavement connection and provides proper drainage at the Lakeshore Drive / Belt Line Rd. intersection. At the time of bidding this project, Lakeshore Drive did not exist, therefore, this section of paving and drainage design could not be included in the project. Change Order No. Four (4) is a decrease of $111,922.04 to the contract. This Change Order deletes the asphalt connection originally proposed at the Belt Line / Denton Tap / Southwestern Blvd. intersection. This change to the contract is now possible since the Coppell city Council required the Gateway Park developer, at this time, to extend Gateway Blvd. west from the Belt Line / Denton Tap intersection to Southwestern Blvd. We recommend approval of these Change Orders since they are in the best interests of the City. Please call should you have any questions. HWG/KP/kep cc: Kevin Peiffer File 255 GINN, IN(]. CI)NSIII,TIN(/ EN(;I NE!!;IIS MEMORANDUM Date: To: From: Subject: March 28, 1988 Larry Jackson Kevin Peiffer. Belt Line Road (N/S) - Change Order No. Two (2) Please find a copy of proposed Change Order No. Two (2) for the above referenced project. This change order allows for the completion of permanent concrete pavement (6-lanes) for a 400' segment of roadway from Hackberry Road South to IH635. This section of paving is now possible as a result of the SDHPT completing their IH635/Belt Line Rd. overpass improvements design. As a result of this additional paving worki the total frontaqe of assessable roadway will chanqe. Please review this proposed change order and advise how the City should proceed from this point forward in order to assess the adjacent property owners for these improvements. For instance, can this segment be added to the present Belt Line Road (N/S) street assessment program of which we have already held public hearings for? We have also enclosed a map showing the original limits of the project along with where Change Order No. 2 is proposed and No. 3 is planned to be proposed. Also copies of the agenda items for the public hearings for the street assessment program are enclosed. Finally, copies are enclosed of the original bid tabulation for construction identifying items that are assessable. We look forward to an expeditious reply so we may advise the contractor without causing any delays to their current contract. Please call if you have any questions. KP/dsp cc: Alan D. Ratliff H. Wayne Ginn File 255 171()3 I'lc.',l~,t~ I~,,~;~tl · ,";uilc I()() ~' I.II I I,q * l):dl;c,, 'l'cxa'~ */ 5 .'_ ,1,q " I'h,,,w 21,1/l,IX Ilnstruclions on rcvcrs¢ side) CllAN(;E No. Two (2) PROJF. CT: Belt I,ine Road City of Coppell OWNER: P.O. Box 478 (Nmfle, Address) Coppe11, TX 75019 CONTRACTOI{: Ed Bell Construction Co. CONTRACT I'~OR: DATEOF ISSUANCE: April 26, 1988 OWNF. IUs P,'ojec! No. P.O. Box 20777 F. NGINF. FA(: Ginn, Inc, (Kevin l)allas, TX 75220-0777 17103 Preston, Suite Bdt LLne Rd. Improvements Dallas, TX 75248 Coppe11, TX ENGINEER's Project No. 255 Pei ffer) You arc directed lo make Ihe fifllowing changes in Iht Contracl Documents. Description: Expand scope of 7 above referenced project by deletinp, asphalt transition and addin? concrete vavement (6-1aries) from llackberry Rd. South to Ill 635 (400' se.c~nent). To complete City's port i.on oF pemanent pavement improvements 1:or Purpose of Change O,-dcr: Belt Line Rd. at III 635 and thus reduce overall project costs to City. This change is ~o~ns.istent. with the orioinal City and. Cotmtv intentions %r the Bdt Line Road project. lachmcnts: (l.ssl documents Sul~porling cJmilge) ~tem L~st CIIANGE IN CONTRACT PRICI{: Original Conlract l'ricc $ 5,540,642.41 i'revious Change Orders No. one Io No. one $ (+) 160,189.35 (Connell escrow) Contract price prior to lifts (.'ha,igc Order $ S, 700,83]. 76 Ncr Increase (t.~.~m~..r~j of this Change Order $ 46,687.60 Conlract Ih'ice with all approved Change Orders $ 5,747,519.36 CilANGE IN CONTRACT TIMF.: Original Contract Time 540 calender days Nel change from previous Change Orders none (0) day~ Contracl Time l'rior lo this Change Order 540 calemler days rials or date Net Increase (decrease) of Ihis Change Order none (0) days Conlracl Time with Jill approved Change Orders 540 calender days days or dale Ai'I'I(OVI{I): AI'I'ROVEi): CHANGE ORDER NO. TWO (2) BELT LINE ROAD (J-255) ITEMS TO BE DELETED FROM CONTRACT ITEM DESCRIPTION 252 SALVAGE & REPLACE BASE 260 LIME TREATMENT FOR MAT. IN PLACE 264 LIME SLURRY, TYPE A, 6% 27 #/SY 340.1 HMACP, TYPE B, CLASS A 340.2 HMACP, TYPE D, CLASS A 676.4 8" TRAFFIC BUTTON, YELLOW (P-18-1-Y) APPROX. UNIT UNITS OUANTITY PRICE CY 280 6.14 SY 1982 2.85 TON 27 73.53 TON 369 39.52 TON 361 43.68 EA 51 27.56 AMOUNT 1,719.20 5,648.70 1,985.31 14,582.88' 15,768.48 1,405.56 TOTAL ITEMS DELETED (41,110.13). ITEMS TO BE ADDED TO CONTRACT ITEM DESCRIPTION UNIT UNITS QUANTITY PRICE 104.1 SAWCUT EXIST. CONC/ASPH LF 110 ROADWAY EXCAVATION CY 160 FURNISH & PLACE TOPSOIL, MEDIANS SY 270 PORTLAND CEMENT TREAT. SY 360.1 9" CONCRETE PAVEMENT (3000 psi) SY 360.2 6" MONOLITHIC CURB (3000 psi) LF 360.3 CONCRETE STREET HEADER LF 524 HYDRAULIC CEMENT, TYPE 1, (54 #/SY) TON 530.1 6" CONCRETE (DRIVEWAYS & MEDIANS) SY 530.4 BRICK PAVERS (CROSSWALKS, MEDIANS) SY 618.1 2" PVC CONDUIT, SCH. 40 LF 618.2 3" PVC CONDUIT, SCH. 40 LF 618.3 4" PVC CONDUIT, SCH. 40 LF 624 PULL BOXES EA 666.1 STOP BAR (18" WIDE) LF 672 6"X6" JIGGLE BAR (REFL, TYPE i-C) EA 69 1.42 630 3.02 685 1.98 4000 1.82 3391 15.70 1363 0.93 55 4.28 108 52.56 59 19.93 313 20.50 808 2.81 400 4.68 125 5.41 6 156.00 24 4.98 28 9.10 AMOUNT 97.98 1,902.60 1,356.30 7,280.00 53,238.70 1,267.59 235.40 5,676.48 1,175.87 6,416.50 2,270.48 1,872.00 676.25 936.00 119.52 254.80 PAGE 1 OF 2 ITEM DESCRIPTION 676.1 4" TRAF. BUTTON, WHITE (NON-REFL) (P-7-W) 676.2 4" TRAF. BUTTON, WHITE (SINGLE-REFL)(P-15-W) C.O. NO. 2-1 4" TRAF. BUTTON, YELLOW (SINGLE-REFL) C,Oo NO. 2-2 SIGNS UNITS UNIT QUANTITY PRICE EA 48 2.24 EA 54 4.06 EA LS AMOUNT 107.52 219.24 9 10.50 94.50 1 2,600.00 2,600.00 TOTAL ITEMS ADDED $87,797.73 NET CHANGE ORDER $46,687.60 PAGE 2 OF 2 ITEM DESCRIPTION 676.1 4" TRAF. BUTTON, WHITE (NON-REFL)(P-7-W) 676.2 4" TRAF. BUTTON, WHITE (SINGLE-REFL) (P-15-W) C.O. NO. 2-1 4" TRAF. BUTTON, YELLOW (SINGLE-REFL) CoOo NO. 2-2 SIGNS UNITS EA EA EA OUANTITY 48 54 9 UNIT PRICE 2.24 4.06 10.50 2,600.00 AMOUNT 107.52 219.24 94.50 2,600.00 TOTAL ITEMS ADDED $87,797.73 NET CHANGE ORDER $46,687.60 PAGE 2 OF 2 CiiANGE ORI)ER (Instructions on reverse side) No. Three (3) PROJECT: Belt Line Road OWNER: City of Coppell (Name, P.O. Box 478 Address) Coppell, TX 75019 CONTRACTOR: Ed Bell Construction Co. P.O. Box 20777 Dallas, TX 75220-0777 CONTRACT FOR:Belt Line Road Improvements Coppell, TX DATE OF ISSUANCE: April 26, 1988 OWNER's Project No. ENGINEER: Ginl~_, Inc. (Kevin 17103 Preston Rd., Dallas, TX 75248 ENGINEER's Project No. 255 Peiffer) Suite 100 You are directed to make the following changes in the Contract Documents. Description: Remove and replace existing concrete pavement on Lakeshore Drive ( 50' segment) to accommodate matching the street grades on Belt Line Road. Purpose ofChangeOrder: To insure proper drainage of the Belt Line Road/Lakeshore _.Drive intersection. Attachments: (List documents snpporting change) CHANGE IN CONTRACr PRICE: Original Conm~ct Price $ 5,540,642.41 Previous Change Orders No. On~ $ 206,876.95 to No. Contract Price prior to this Change Order $ 5,747,519.36 Net Increase (d~i~) of this Change Order 22,267.59 $ Contract Price with all approved Change orders 5,769,786.95 $. CitANGE IN CONTRACI' TIME: Original Contract Time 540 calender days days or dale Net change from previous Change Orders none (0) days Contract Time Prior to this Change Order 540 calender days days or date Net Increase (decrease) of this Change Order none (0) Contract Time with all approved Change Orders 540 calender days RECOM MEN DED: EJCDC No. I~lO-g-B ( 1993 Edition) APPROVED: by APPROVED: Prepared by Ibc Engineers' Joinl Contracl I)ocuments (?ollultillc¢ ami endorsed by Thc Associalcd Ge.er;ti {.?onlraclols of ^merles. //',///?///Chang® Order No. Two (2) ///i ......... ~4~4,4..~.,~ ~ ~~~..~o~.r~,,~ Change Order No. Three (3) R.O.W. MAP GINN. INC. CHANGE ORDER NO. THREE (3) BELT LINE ROAD (J-255) ITEMS TO BE ADDED TO CONTRACT ITEM DESCRIPTION 100 PREPARE R.O.W. 104.1 SAWCUT EXIST. CONC/ASPH 260 LIME TREATMENT, MATLS · IN PLACE 264 LIME SLURRY, TYPE A, 6%, 27 #/SY APPROX. UNIT UNITS QUANTITY PRICE STA 0.5 3,506.11 LF 45 1.42 SY 333 2.85 TON 5 73.53 360.2 6" MONOLITHIC CURB (3000 psi) LF 464.1 21" RCP, CLASS III LF 530.1 6" CONCRETE (MEDIAN NOSE) SY 672 6"X6" JIGGLE BAR (REFL. , TYPE l-C) AMOUNT 1,753.06 63.90 C.Oo NO. 3-1 REMOVE, SALVAGE & REPLACE PAVERS 949.05 5' STD. CURB INLET 367.65 C°O. NO. 3-2 200 0.93 186.00 77 30.16 2,322.32 26 19.93 518.18 EA 12 9.10 300 16.00 SY EA 109.20 4,800.00 2 2,500.00 5,000.00 CoOo NO. 3-3 7" CONC PVMT. (3000 psi) TOTAL CHANGE ORDER SY 311 19.93 6,198 . 23 $22,267.59 PAGE 1 OF 1 475.9 4' DROP INLET, TYPE X OR Y 524 HYDRAULIC CEMENT, TYPE I, (54#/SY) 666.1 STOP BAR (18" WIDE) 672 6"X6" JIGGLE BAR (REFL., TYPE i-C) 676.1 4" TRAF. BUTTON, WHITE (NON-REFL) (P-7-W) 676.2 4" TRAF. BUTTON, WHITE (SINGLE REFL)(P-15-W) 676.4 8" TRAF. BUTTON, YELLOW (P-18-1-Y) EA TON LF EA EA EA EA 13 33 8 8 8 19 1,508.00 52.56 4.98 9.10 2.24 4.06 27.56 1,508.00 683.28 164.34 72.80 17.92 32.48 523.64 TOTAL CHANGE ORDER ($111,922.04) PAGE 2 OF 2 ~ELT LINE ROAD IMPROV~ I R.O.W. MAP [ GINN 'INC. ~--- ~., !=.,.- 1= ,:-.