Tax 2011A-CS110711 (8/18/2011) Keith Marvin - Re: improvements to sandy knoll dr.Page 1 From: Keith Marvin To:procter, charles Date: 7/11/2011 8:33 AM Subject: Re: improvements to sandy knoll dr. Mr. Proctor, Sorry for the delay in responding to your inquiry, I was out of the office last week. You will likely see survey activity taking place over the next several weeks. Once the survey is complete the design work will begin. I would not expect to have completed plans until the end of the year. Construction is slated to begin during the spring of 2012. I'll try to keep you posted of our progress and let you know when we have something for you to take a look at. For the most part though we are seeking to replace what's there as near as practical to the current location. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "charles procter" <procterc@gte.net> 7/4/2011 6:07 PM >>> Sir, Thank you for the letter of the 30th last. I was planning to remove some tree stumps, and repair my sprinkler system at 401 Sandy Knoll. Where can i look at the proposed improvements so that I can make changes that do not interfere with the improvements, or vice versa. Regards. Charles W Procter.