Tax 2011-CS110518
(8/22/2011) Keith Marvin - RE: Scope and FeePage 1
From:
"Raj Mehta" <RMehta@jqieng.com>
To:
"Keith Marvin" <kmarvin@coppelltx.gov>
CC:
"Chris Maman" <cmaman@jqeng.com>
Date:
5/18/2011 9:57 AM
Subject:
RE: Scope and Fee
Keith:
I'll get it done and back over to you. Thanks for the opportunity and
let us know right away if you need additional info (insurance, etc.) to
move forward.
Raj
C. RAAJAN MEHTA, PE
PRINCIPAL
JQi
2105 COMMERCE STREET, SUITE 200, DALLAS, TEXAS 75201
972 392.7340 PHONE 972.603.6653 CELL
JQENG.COM
The information in this e-mail is confidential and may be legally
privileged. It is intended solely for the addressee. Access by any other
person to this e-mail is not authorized. If you are not the intended
recipient, please delete this e-mail. Any disclosure of this e-mail or
of the parties to it, any copying, distribution, or any action taken or
omitted in reliance on it is prohibited, and may be unlawful.
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Wednesday, May 18, 2011 8:36 AM
To: Raj Mehta
Subject: Re: Scope and Fee
Raj,
I looked through this, and it looks to be in good shape. The only thing
I added was a mylar set of as-builts. Go ahead and strip out the
attachment "A" from the contract and replace it with this. Fill in your
numbers and your firm information. We're going to pass on the as-built
survey, so go ahead and pull that out of your numbers.
We'll also need a rate sheet for additional services in the event we
need to do an amendment. You can put the as-built survey info in there
in the event we want to add it later.
Call with any questions. We'll shoot for the June 14th City Council
meeting for award.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
(8/22/2011) Keith Marvin - RE: Scope and FeePage 2
>>> "Raj Mehta" <RMehta@jqieng.com> 5/17/2011 5:07 PM >>>
Keith:
We can provide boundary verification as part of the as-built survey. No
fee revision for that line item was required. I did adjust the
reproduction costs to deliver the required number and format of progress
submittals. I also increased technician time by 20 hrs for the overall
project to allow for delivery of CADD files at the 60% and 90%
milestones.
The contract language is fine. I made majority of adjustments in
Attachment A. I assume my scope id the "Project Specific Scope"
referred to in Attachment A. Changes that I made to the Project
Specific Scope are highlighted in yellow. I'm guessing you and I may
have one more round of comments/revisions, but I am pleased we were
close on the first go-around.
Thanks,
Raj
C. RAAJAN MEHTA, PE
PRINCIPAL
2105 COMMERCE STREET, DALLAS, TEXAS 75201
972 392.7340 PHONE 972.603.6653 CELL
RMEHTA@JQIENG.COM EMAIL
JQENG.COM
ZWEIG WHITE HOT FIRM
2009, 2008, 2007
ZWEIG WHITE BEST FIRM
2009, 2008, 2007
(8/22/2011) Keith Marvin - RE: Scope and FeePage 3
The information in this e-mail is confidential and may be legally
privileged. It is intended solely for the addressee. Access by any other
person to this e-mail is not authorized. If you are not the intended
recipient, please delete this e-mail. Any disclosure of this e-mail or
of the parties to it, any copying, distribution, or any action taken or
omitted in reliance on it is prohibited, and may be unlawful.