Loading...
ST9304-AG 880126I. AGENDA DATE REQUESTED: 1/26/88 P.O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 II. RECOMMENDED ITEM CAPTION: Discussion and Consideration of approval of a resolution endorsing the alignment of Belt Line Road east of MacArthur Blvd. to the East City Limits of Coppell. III. RECOMMENDATION OF PLANNING & ZONING COMMISSION: IV. VI. VII. VIII. IX. X. STAFF REPRESFNTATIVE(S) TO ATTEND COUNCIL MEETING: Ginn ¢ Inc. RECOMMMENDED TO BE DISCUSSED AT PRE-COUNCIL BRIEFING: Yes __ No xx SUPPORT MATERIAL: SUBMITTED Yes xx No DATE SUBMITTED TO CITY ATTORNEY'S OFFICE FOR PREPARATION OF ANY LEGAL DOCL~ENT, ORDINANCE, RESOLUTION, ETC. FINANCIAL REVIEW: BUDGETED ITEM NON BUDGETED ITEM ORIGINAL ESTIMATE OR BUDGET $ CURRENT ESTIMATE: $ AMOUNT UNDER OR OVER BUDGET $ SUBMITTED BY Ginn. In~. APPROVAL OF CITY MANAGER'S OFFICE: SOURCE OF FUNDING: BOND FUNDS OPERATING BUDGET OTHER: ACCT. NO. HOLD AGNDARQSTFORM MNITS ITEM CITY MANAGER'S COMMENTS/RECOMMENDATION FOR AGENDA ITEM I. Item #4 CITY COUNCIL AGENDA DATED: January 26, 1988 II. COMMENTS/RECOMMENDATION: As indicated in the attached letter from Wayne Ginn, the County realigned the eastern section of Beltline to avoid paying for right-of-way from the railroad. We recommend your approval of the Resolution which will allow Dallas County to proceed with the redesign of Beltline Road in this area. #4 MDEB CITY A RESOLUTION OF THE CITY OF COPPELL, TEXAS RESOLUTION NO. RESOLUTION STATING THE NEED TO SUPPORT DALLAS COUNTY DEPARTMENT OF PUBLIC WORKS PROPOSED RE-ALIGNMENT OF BELT LINE ROAD FROM MACARTHUR BOULEVARD TO THE EAST CITY LIMITS WITHIN ITS CURRENT RIGHT-OF-WAY. WHEREAS, the City of Coppell and Dallas County have agreed to improve Belt Line Road from MacArthur Blvd. to the East City Limit of Coppell; and WHEREAS, Dallas County has determined that it is more economically justifiable to offset the roadway improvements to the south portion of the existing Right-of-Way than to pay the costs of the slope easements required for slope encroachments of the St. Louis Southwestern Railway Company Right-of-Way, if the roadway is to be constructed as originally planned, centered within the existing Right-of-Way. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Coppell, Texas that: SECTION 1: The City of Coppell supports the re-alignment of Belt Line Road from MacArthur Boulevard to the Coppell East City Limits, as proposed by the Dallas County Department of Public Works. SECTION 2: That a copy of this resolution be sent to Dallas County Commissioner, Precinct No. 1, Honorable Jim Jackson. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF COPPELL, TEXAS, ON this the day of , 19__. ATTEST: DOROTHY TIMMONS, City Secretary LOU DUGGAN, Mayor APPROVED AS TO FORM: LAWRENCE JACKSON, City Attorney GINN, INC. January 20, 1988 Mr. Alan D. Ratliff, City Manager City of Coppell P.O. Box 478 Coppell, Texas 75019 CONSULTING ENGINEERS JAN g ! 1989 CIT_Y[MANAGER Re: Realignment of Belt Line Road (E-W) within its current Right-Of-Way from MacArthur Boulevard to the East City Limit. Dear Mr. Ratliff: Dallas County is proposing to realign the proposed Belt Line Road Improvements within the existing Right-Of-Way in order to avoid encroaching the St. Louis - Southwestern Railway's adjaCent Right-Of-Way with fill slopes. The Railroad is asking $ 7.00/SF for the slope easements required for the improvement of the road in its original alignment within the existing Right-Of-Way. As a cost and time saving measure, the County has had their consulting engineer revise the alignment of the road by simply reducing the southern parkway from 14' to 9' and reducing the center median width from 24' to 13', which has the effect of moving the roadway over to the south three quarters of the existing Right-Of-Way. The proposed realignment does not affect the roadway paving widths, will meet the existing MacArthur Boulevard intersection, and will have no effect on Belt Line Road west of MacArthur Boulevard. Dallas County is withholding authorization for their consulting engineer to continue with redesign of Belt Line Road from the east City Limits of Coppell to Hutton Branch in Carrollton, until they receive Coppell's approval of the proposed realignment. If the Coppell City Council approves the proposed realignment of Belt Line Road, Ginn, Inc. can begin redesign of this segment of Belt Line Road immediately in order to complete Coppell's segment of the project in a timely manner so that it may be included with the County's segment in a single construction project as originally intended. Sincerely~ / H. Wayne Ginn, P.E. City Engineer cc: Mayor and City Council Kevin Peiffer, Ginn, Inc. John C. Karlsruher, P.E., Ginn, Inc. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 Al /SL& SW '~ / RAILROAD TYPICAL SECTIONS BELT LINE ROAD (E-W) T ~ '~// ALTER N.AALTI.~NMENT ~----// (Using' Ex,st~ng R.O.W.)