Loading...
ST9905-CS091006 (2) (8/22/2011) Keith Marvin - Re: Coppell Road & BethelPage 1 From: Keith Marvin To:Caudill, Robert CC:Odell, Richard Date: 10/6/2009 10:05 AM Subject: Re: Coppell Road & Bethel Can we not put the surface applied domes in? http://www.armor-tile.com/surface_applied_system.html We also need to get the landscaper from Bethel Road out to restore the dead plantings from the channel mitigation area. We have only about 80% survival of the trees and shrubs. Do we need to meet out there and look at this, or can you have him go by and look at it? Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Robert Caudill" <rcaudill@TiseoPaving.com> 10/5/2009 7:49 AM >>> Keith; The cost to sawcut/remove/replace existing drive pavement with truncated dome pavers and 6" concrete subbase (approx. 6' x8') is $1,825.00/ls. Robert Caudill Vice President Tiseo Paving Company (972) 289-0723