Loading...
ST9902-EM100518 ITEM DESCRIPTION OF ITEMS NO.QUANTITYUNITUNIT COSTTOTAL PAVING IMPROVEMENTS 1RIGHT-OF-WAY PREPARATION$2,500.00$50,000 20STA 2MOBILIZATION$200,000.00$200,000 1LS 3CONCRETE REMOVAL$5.00$11,750 2350SY 4HMAC REMOVAL$5.00$27,000 5400SY 5UNCLASSIFIED STREET EXCAVATION$12.00$240,000 20000CY 68" CEMENT STABLIZED SUBGRADE$2.50$34,000 13600SY 7CEMENT STABLIZATION (42#/SY)$110.00$31,900 290TON 88" REINFORCED CONCRETE PAVEMENT$45.00$585,000 13000SY 98" ENHANCED PAVEMENT$100.00$20,000 200SY 10REMOVE 6" HMAC PAVEMENT TRANSITION$5.00$5,500 1100SY 11STEPPED BLOCK RETAINING WALLS$25.00$25,000 1000SF 12PVC CONDUIT$10.00$4,500 450LF 13PAVEMENT MARKINGS AND SIGNAGE$80,000.00$80,000 1LS 14BARRICADES, SIGNS & TRAFFIC CONTROL$200,000.00$200,000 1LS 15EROSION CONTROL$50,000.00$50,000 1LS 1610' BIKE PATH$7.00$119,000 17000SF 175' SIDEWALK$5.00$45,750 9150SF 18BARRIER FREE RAMP$1,000.00$6,000 6EA 19STREET LIGHT FOUNDATION$2,000.00$40,000 20EA 20RESTORE PARKWAYS$4,000.00$80,000 20STA 21RESTORE/RECONSTRUCT EXISTING IRRIGATION$30,000.00$30,000 1LS $1,885,400 SUBTOTAL PAVING BRIDGE 1DEMO EXISTING BRIDGE$35,000.00$35,000 1EA 2FLEXIBLE BASE$50.00$14,000 280CY 318" DRILL PIERS$60.00$9,120 152LF 430" DRILLED PIERS$90.00$33,750 375LF 5CONCRETE ABUTMENTS$550.00$57,750 105CY 6CONCRETE BENTS$600.00$49,800 83CY 78" THICK BRIDGE DECK$12.00$156,048 13004SF 8EXPOXY WATERPROOFING$1.00$3,650 3650SF 9CONCRETE SURFACE TREATMENT$1.50$19,074 12716SF 10TYPE C PRESTRESSED CONCRETE GIRDERS$70.00$110,670 1581LF 11CONCRETRE RIP-RAP$250.00$43,750 175CY 12STRUCTURAL STEEL - ARMOR JOINT$4.00$25,600 6400LB 13SPECIAL TRAFFIC / PEDESTRIAN RAIL$125.00$24,125 193LF 14SPECIAL TRAFFIC / BICYCLE RAIL$140.00$54,040 386LF 15CONCRETE APPROACH SLABS$250.00$36,000 144CY 16METAL BEAM GUARD FENCE$25.00$10,000 400LF 17ELECTRICAL CONDUIT$5.00$4,400 880LF 18LIGHT STANDARDS$1,500.00$6,000 4EA 19ENHANCED PAVEMENT$5.00$10,875 2175SF $703,652 SUBTOTAL BRIDGE WATER 1RELOCATE / ADJUST 24" WATER LINE$150.00$22,500 150LF 2RELOCATE MISC. WATER (HYDRANTS, VALVES, ETC)$25,000.00$25,000 1LS $47,500 SUBTOTAL WATER RELOCATION DRAINAGE 1DEMO RCP STORM DRAIN$10.00$0 LF 2DEMO HEADWALLS$1,000.00$1,000 1EA 3CONNECT TO EXISTING RCP$400.00$800 2EA 430" CLASS III RCP$100.00$15,000 150LF 524" CLASS III RCP$90.00$54,000 600LF 618" CLASS III RCP$75.00$35,625 475LF 710' RECESSED CURB INLET$3,000.00$24,000 8EA 84' SQUARE MANHOLE$3,000.00$6,000 2EA 9TRENCH SAFETY$2.00$2,450 1225LF $138,875 SUBTOTAL DRAINAGE LANDSCAPING / IRRIGATION WEST SANDY LAKE ROAD 1LS 1$200,000.00$200,000 404 MITIGATION 1LS 2$50,000.00$50,000 $250,000 SUBTOTAL LANDSCAPING PROJECT SUBTOTAL $3,025,427 $453,814 15% CONTINGENCY PROJECT TOTAL $3,479,200