ST8805-CS 880927GINN, INC. CONSIII.TING ENGINEERS September 27, 1988 Mr. Jay Chester, P.E. Project Manager ABQ Development Corporation 625 Silver SW, Suite 200 Albuquerque, NM 87125 Re: 16" Waterline - parkway Blvd. Dear Mr. Chester: In mid-1985, the City of Coppell installed a 16" waterline north along Denton Tap Road from Sandy Lake to Parkway BOulevard. This was part of the City's original agreement with Univest to extend City water to Parkway Boulevard. In addition to the above, Univest participated via a change order to the Denton Tap Waterline project by funding the extension of the 16" waterline from Denton Tap Road to Town Center. This extension was also part of the City/Univest agreement. At this time, the City is desiring to include, with their 24" crosstown waterline project, the installation of the remaining segment of 16" waterline still needed to complete the distribution loop in Parkway Boulevard. We have enclosed a location map and construction plans showing this referenced segment (Line C). A portion of this segment, per the agreement, is required to be funded by ABQ, and the remainder by the City. Our records show that the applicable portions of responsibility are as foll0ws: City of Coppell: 930 LF ABQ: 1485 LF Total: 2415 LF For your information, the obligations for both parties were based on ownership'of frontage to Parkway Boulevard, each entity being responsible along their own frontage. It is the desire and intent of the City to-first make you aware of this project, and secondly, secure an escrow deposit from ABQ to fund your portion. 17103 Prcsto,~ Road · St;ih. I{~1 · I.III1t4 · Dallas. Tcxas 75248 · I'honc 214/24R-4{M}O Including this segment into the scope of a much larger project, the 24" Crosstown. Waterline, should secure very reasonable and mutually beneficial unit prices. Our intent is to be ready to receive bids for this project in early November, 1988. With this schedule in mind, the City would like to begin workiHg with you at this t~me on any details needing to be worked out. The actual escrow deposit amount can be determined between the date bids are received and the contract awarded. We look forward to hearing from you soon. Sincerely Kevin Pei~'~er KP/dsp cc: Russell Doyle'L/// Mike Allen Jerry Parche H. Wayne Ginn File 274