ITEM CAPTION:
Consider approval of a contract with Time Warner Cable in the amount of $120,453.00 for the burial of utilities in Old
Town; as provided for in the CIP funds; and authorizing the City Manager to sign and execute necessary documents.
GOAL(S):
EXECUTIVE SUMMARY:
This is a follow -up to the work session item taken on July 12, 2011 regarding the Old Town Aerial Crossings.
Staff will be available to answer any questions.
FINANCIAL COMMENTS:
Funds are available in Street CIP for this contract.
RECOMMENDED ACTION:
ACTION TAKEN BY COUNCIL:
Staff recommends approval of this contract. APPROVED BY
CITY COUNCIL
ON ABOVE DATE
Motion to Approve
M - Tunnell
S - Mahalik
Vote - 7 -0 ew
Contract Time Warner Old Town -1 AR
MEMORANDUM
TO: Mayor and City Council
VIA: Kenneth M. Griffin, P.E., Director of Engineering/Public Works
FROM: Keith R. Marvin, P.E., Project Engineer
DATE: August 23, 2011
RE: Consider approval of a contract with Time Warner Cable in the
amount of $120,453.00 for the burial of utilities in Old Town; as
provided for in the CIP funds; and authorizing the City Manager to
sign and execute necessary documents.
On July 12, 2011 city staff brought forward a work session item for discussion on the
burial of certain overhead utilities within the Old Town Coppell area. Working with the
guidance we received during that meeting we negotiated this contract with Time Warner
Cable for burial of all of their overhead facilities between Mitchell and Freeport.
The estimated price for this burial is $120,453.00. All work associated with this burial
will be done by Time Warner Cable, or their contractor. The location of the lines to be
buried are identified on the included exhibit.
This work is being done to enhance the appearance of the Old Town area. This will tie in
with the necessary relocation of utilities as we move closer to beginning construction in
the area.
We are continuing to work with Oncor to negotiate a contract to bury their service line
crossings as well. In the event the value of that contract exceeds the approval limit of the
City Manager, we will bring an agenda item next meeting for approval as well.
We recommend approval of this contract in the amount of $120,453.00 with Time
Warner Cable for burial of utilities in the Old Town area. Staff will be available to
answer any questions at the Council meeting.
1
I -- DisT auTioN - $ 1 5,000
2.TrnF WARN Fa .—IF - F—T vF $1 20,453
f 540
W H
7
G
AERIAL CROSSING BURIAL
RM o `'
PLAN r
s� SHEET FA 's Mav 2- CITY OF COPPELL
DALLAS COUNTY, TEXAS 1
1.0NCVa DISTRIV 'IN - $35,00❑
1 .DNCOR sFavicF TO Fnarn Fas MARKET -TV HF 1 . ❑NC Va DISTRIV UTivN - $3H,00❑
1.0NCVa - $6,50❑
a
2.TirnF WARNER CnecF - F—T vF $ 1 20,453
R... — 2.TirnF WARN CR Cn e.. - P—T IF $120,452
2.C1TV ELECTRIC inN $40❑
f
-
—
aFT�FL Ro
F
5
41�
7
G
AERIAL CROSSING BURIAL
RM o `'
PLAN r
s� SHEET FA 's Mav 2- CITY OF COPPELL
DALLAS COUNTY, TEXAS 1
MAINTENANCE CONSTRUCTION RELO AGREEMENT
TIME WARNER NY CABLE LLC
Project: City of Coppell, Bethel Road Relo C2011 -048
This Maintenance Construction Relo Agreement (this, "Agreement') is made
and entered into this 29th day of August, 2011 (the "Effective Date ") by and between
Time Warner NY Cable LLC., d /b /a Time Warner Cable (the "Company "), a Delaware
limited liability company and its affiliates, with an office at 1565 Chenault St., Dallas,
Texas, 75228; and City of Coppell (the "Party ") and its affiliates with an office at 255
Parkway Blvd, Coppell, Texas. 75019. The "Company" and the "Party" ( "Party)
referred to individually) hereinafter will sometimes be referred to collectively as the
"Parties."
This Agreement is in response to a request from the Party (named above) to
Time Warner Cable to relocate CATV utilities. The contact for the Party is Keith
Marvin, City of Coppell, P.E., Civil Engineer, City of Coppell; and the contact for the
Company is David Cheney, Time Warner Cable, Construction Supervisor. Following is
the project description for the work to be performed by Time Warner Cable: Time
Warner Cable will relocate aerial plant to underground; the project is located along
Bethel Road from just east of South Coppell Road to Freeport Parkway, Coppell,
Texas. The cost for this work is estimated at: $120,453.00
The fully executed agreement authorizes the work for the Party. You must
return this signed agreement, before your work will be scheduled. If you agree to
these terms, please sign below and return one signed agreement to Time Warner
Cable, the mailing address and contact information is listed at bottom of page 3 of this
agreement. Please retain one signed agreement for your records. This actual cost
will be billed to you upon completion of the work. Your reference number and invoice
number is C2011 -048 this number is to be referenced on your check.
By signing below, you warrant that you are authorized to bind the company or
entity to the terms of this agreement. Upon receipt of your signed agreement, your
work order will be released to our Construction Department for scheduling.
Time Warner Cable Inc., through its North Texas Region, d /b /a Time Warner
Cable, shall not be responsible to the extent its performance is delayed or prevented
due to causes beyond its control, including but not limited to acts of God or the public
enemy, terrorism, civil commotion, embargo, acts of government, any law, order,
ordinance, regulation, or requirement of any government, fires, explosions, weather,
quarantine, strikes, labor disputes, lockouts, and other causes beyond the reasonable
control of Time Warner Cable.
Pagel of 3
MAINTENANCE CONSTRUCTION RELO AGREEMENT
TIME WARNER NY CABLE LLC
Project: City of Coppell, Bethel Road Relo C2011 -048
Please be advised that the price quoted in this agreement is only valid for sixty
(60) days from effective date of this agreement. If this work request is cancelled after
you have signed the agreement, you will be billed for any Engineering and
Construction cost incurred after the date of signature that may include the cost to
place and /or remove facilities.
If we do not receive this signed agreement from you within fifteen (15) days
from the effective date on agreement, we will assume that you do not want the work to
be undertaken and the project will be cancelled. Should you have any questions or
concerns regarding agreement terms, please contact Annette Eitt at 214 - 320 -7415 or
via email at annette.eitt(aDtwcable.com
IN WITNESS WHEREOF, the Parties have caused this Agreement to be
signed by their respective duly authorized representatives.
TIME WARNER NY CABLE LLC
North Texas Region
d /b /a Time Warner Cable
1565 Chenault St.
Dallas, TX 75228
Z &% P / 7 , 4 -
be/Robfnrsb W Director of Construction
Date:
CC:
David Cheney, Construction Supervisor
Obligatory Planner / Engineer
Page 2 of 3
MAINTENANCE CONSTRUCTION RELO AGREEMENT
TIME WARNER NY CABLE LLC
Project: City of Coppell, Bethel Road Relo C2011 -048
City of Coppell
Attn: Keith Marvin, P.E.
255 Parkway Blvd.
Coppell, TX 75019
I agree to the terms of this agreement:
Accepted (Signature): l
Print Name & Title: C �0.0 +� ►,�s, ���' ' `C Q e
City or Business Name: C '4!A oT C o e '
Billing Address: C), —6 °X 9 4-78
City /State /Zip:
7 SQ
Telephone #:
Date:
* * * * * * * * * * * * * * * * * * * **
Time Warner Cable Mailing Address & Contact Information:
Time Warner Cable
Attn: Annette Eitt /Construction Department
1565 Chenault St.
Dallas, TX 75228
(office phone) 214
(email) annette eitt twcable.com
t: PPM
Page 3 of 3