August 22, 2011
Roger Dupre
3D Paving & Contracting LLC
161 Lansdowne Cir
Coppell TX 75019
RE: SW 08 -01 Denton Tap Sidewalk In -fill Project
Final Acceptance
Dear Mr. Dupre:
Representatives of the City of Coppell have confirmed a final inspection of paving for the
referenced project. The two -year maintenance bond and record drawings have been
received. Maturity on the bond will be two years from the date of this letter.
A follow -up inspection of the improvements will be conducted prior to the lapse of the two -
year bond period. If any punchlist items are noted at that time, you will be contacted to
make repairs. Thanks for your cooperation.
Sincerely,
'Keith R. Marvin, P.E.
Project Engineer Georg ars all ' . .
Office Phone: (972) 304 -368
Fax: (972) 304 -3570
cc: Ken Griffin, P.E., Director of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Director of Public Works
Per Birdsall, Street Operations Manager