Loading...
SW0801-CS110825 T H E • C 1 T Y O F COPPELL ":7 August 22, 2011 Roger Dupre 3D Paving & Contracting LLC 161 Lansdowne Cir Coppell TX 75019 RE: SW 08 -01 Denton Tap Sidewalk In -fill Project Final Acceptance Dear Mr. Dupre: Representatives of the City of Coppell have confirmed a final inspection of paving for the referenced project. The two -year maintenance bond and record drawings have been received. Maturity on the bond will be two years from the date of this letter. A follow -up inspection of the improvements will be conducted prior to the lapse of the two - year bond period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks for your cooperation. Sincerely, 'Keith R. Marvin, P.E. Project Engineer Georg ars all ' . . Office Phone: (972) 304 -368 Fax: (972) 304 -3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Per Birdsall, Street Operations Manager A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV