Loading...
ST9902-CS101229 (8/26/2011) Keith Marvin - Re: any wordPage 1 From: Tim Oates To:rupertkeeping Date: 12/29/2010 9:19 AM Subject: Re: any word Mr. Keeping, I have spoken with the decision makers on your inquiry...the consensus is to remove the median and sign at the time of the Sandy Lake Road reconstruction. I do not know the exact time line on the Sandy Lake reconstruction, the prep work, underground utility locates/relocates, etc will begin soon, but the entire project will take 18 to 24 months. If you want to check the progress of the project, you can refer to the Engineering Construction Projects portion of the City of Coppell website at http://coppelltx.gov/departments/departments-a-e/engineering/current-construction-projects If you have any additional questions that I may be able to assist with, please feel free to contact me directly. Tim Oates Coppell Fire Department Deputy Chief - Prevention 500 Southwestern Blvd. Coppell, Texas 75019 Office: 972-304-7055 Fax: 972-304-3514 e-mail: toates@coppelltx.gov >>> "rupertkeeping" <rupertkeeping@verizon.net> 12/28/2010 11:16 AM >>> Tim, Have you been able to get any indication as to whether or not engineering will cooperate with the removal of the monument at Summer Place? rwk