Loading...
ST9902-CS110224(8/29/2011) Keith Marvin -West Sandy Lake Page 1 From: Keith Marvin To: Birdsall, Per; Dutt, Ted; CC: Griffin, Ken; Latta, Scott; Date: 2/24/20119:08 AM Subject: West Sandy Lake Gentlemen, Garza, Michael; Hollowell, Glenn; Marshall... Odell, Richard I have set up a plan review meeting with The design engineer for West Sandy Lake Road for next Thursday (3/3/11) at 9:30am in the first floor conference room at Town Center. All are welcome to attend. If you do not care to attend, but would like to provide some feedback on the plans, please stop by our office sometime between now and then to take a look. A few notes: I will provide the water and sewer direction based on our prior discussions. We will abandon the 8" water from S. Coppell to Denton Tap, and connect all services and mains to the 24" line. All sanitary sewer lines that will fall under the new paving will be replaced. There are no traffic signal plans included in this set. These will be submitted shortly, and will be sent to Traffic for a detailed review. There are signing and stripping plans. Please take a look at these. My goal is to have these plans ready to bid by the end of the year. Utility relocations will begin soon out there, and as they near completion we should be prepared to begin our work. Thanks for your help. Keith Keith Marvin, P.E. Project Engineer (972) 304 -3681