ST9902-CS110606
(8/29/2011) Keith Marvin - RE: ST 99-02 West Sandy Lake RoadPage 1
From:
"Chris B. Seely" <cseely@tnp-online.com>
To:
"Keith Marvin" <kmarvin@coppelltx.gov>, <bryan.williams@oncor.com>
Date:
6/6/2011 9:07 AM
Subject:
RE: ST 99-02 West Sandy Lake Road
Keith:
We will revise the trail location on Sandy Lake to address the conflicts
with Oncor at 90+50 and at 103+00. Additional pole relocations in these
areas will not be necessary.
Thanks!
Chris
Chris Seely, P.E. (TX)
Teague Nall and Perkins, Inc.
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Thursday, June 02, 2011 5:00 PM
To: bryan.williams@oncor.com
Cc: Chris B. Seely
Subject: ST 99-02 West Sandy Lake Road
Bryan,
Thanks for calling me back this morning to discuss our upcoming W. Sandy
Lake Road project. I'm attaching a PDF file with the plan and profile
of our current plans.
We have a conflict with Oncor's transmission lines at the east end of
the project. There are poles along the South side of Sandy Lake at
approximate stations 109+60, and 107+00 that are in direct conflict with
the roadway, and will need to be relocated.
There are conflicts with the sidewalk at stations 103+00 and 90+50. I
will discuss these two locations with the engineer and see if we can
reroute the sidewalk to avoid the conflict on our end.
There is an additional phase of this project that will come shortly
after this one that will require the relocation of additional poles west
of this project. We are still working on detailed plans for this future
section, but it might be beneficial to try to do all the relocations as
one project.
Our goal is to be prepared to begin construction on this project around
the first of the year.
Thanks for your assistance. Please let me know if I can provide any
additional information.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
(8/29/2011) Keith Marvin - RE: ST 99-02 West Sandy Lake RoadPage 2