Keith,
We wanted to confirm intent for a water line on Sandy Lake. Attached is an exhibit showing the area and
lines in questions. There is an existing 8" line to be abandoned that serves Shadydale Acres. The
markups you provided indicated that this 8" connection should be relocated and tied into a 6" blow off
valve line. So our question is, do you want the 6" line replaced with an 8" up to the 24" main, or will the 6"
lead line suffice?
Thanks.
Mark
-----Original Message-----
From: TNP [mailto:matkins@tnp-online.com]
Sent: Monday, July 11, 2011 5:04 PM
To: Mark Holliday
Subject: water line question
Please open the attached document. This document was digitally sent to you using an HP Digital Sending
device.