Loading...
ST9902-CS110727 (8/29/2011) Keith Marvin - Fwd: Sandy Lake Power PolesPage 1 From: Keith Marvin To:Richard.brewster@oncor.com CC:Seely, Chris B. Date: 7/27/2011 8:33 AM Subject: Fwd: Sandy Lake Power Poles Attachments:Document.pdf Richard, The attached PDF file from TNP shows the pole locations you sent plotted on our sheets. TNP will be moving the sidewalk approximately 2 feet closer to the curb to avoid conflict with the poles. Chris Seely has noted a few conflict locations where he would like you to consider shifting the poles. It appears that you have perhaps already agreed to shift some poles from the locations shown as well. Once we have the pole locations finalized, we can do this again to be sure we are still ok. Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Chris B. Seely" <cseely@tnp-online.com> 7/26/2011 4:05 PM >>> Keith: Attached is the markup with the Oncor power pole locations. Also, take a look at Arbor Manors connection to Sandy Lake. We are going to have trouble ending the paving before the pavers in this area. I think we can take them out and stop right at or prior to the existing inlets. What are your thoughts? Thanks! Chris Chris Seely, P.E. (TX) TEAGUE NALL AND PERKINS, INC. -----Original Message----- From: TNP [mailto:matkins@tnp-online.com] Sent: Tuesday, July 26, 2011 3:43 PM To: Chris B. Seely Subject: 9050MFP Scan Please open the attached document. This document was digitally sent to you using an HP Digital Sending device.