Loading...
ST0701-CS080222 (8/30/2011) Keith Marvin - Re: Southwestern Blvd.Page 1 From: Keith Marvin To:Smith, Madonna CC:Littleton, Dave Date: 2/22/2008 8:56 AM Subject: Re: Southwestern Blvd. Thanks for sending me this drawing. I'll review it and prepare some feedback. Can we meet next week to discuss it? I'm available on Monday or Tuesday afternoon. As far as utilities go, I am happy to set up a coordination meeting, however there does not appear to be enough information here for the utility companies to plan their relocations. I am looking at Thursday March 13th, or Thursday March 20th at 2:00pm for a meeting. Does one of those work better than the other for you? Will we be able to make some progress on adding drainage and utilities to the plans by then? Let me know on these meetings. Thanks. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Smith, Madonna" <msmith@Halff.com> 2/21/2008 2:31 PM >>> Keith, Attached is a schematic plan and profile of Southwestern Blvd. at Grapevine Creek. What we have shown is the proposed alignment west of the creek and the trees that will be spared and a few that will need to be removed. The profile shows the proposed pavement connection to the existing bridge at elevation 510.00 and the approximate pavement connection to a proposed bridge elevation of 513.00. We need to schedule a utility coordination meeting with Oncor, Atmos and Verizon. Do not hesitate to contact me or Dave Littleton with questions or concerns. Thank you, Madonna Smith, P.E. Project Manager HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, Texas 75081 Phone 214-217-6688 Fax 214-739-0095 www.halff.com