Loading...
ST0701-EM081203 (2) PROJ: SOUTHWESTERN BLVD. FROM GRAPEVINE CREEK TO BELT LINE ROADPREP'D BY:RG AVO: 24732CHK'D BY:JR PAVING/GRADING GEN. SHEET SHEET SHEET SHEET SHEET SHEET PLAN ITEM NO.ITEM DESCRIPTIONUNITITEMC2.01C2.02C2.03C2.04C2.05C2.06QTY.BID QTY.UNIT PRICEBID ESTIMATE 1BMobilizationLS111$ 100,000.00$ 100,000.00 2BTraffic ControlLS111$ 20,000.00$ 20,000.00 3BStreet StripingLS111$ 15,000.00$ 15,000.00 4BClearing and GrubbingLS111$ 28,000.00$ 28,000.00 5BRemove Existing Asphalt PavementSY7001,3601,3802,3052,4208,1658,200$ 8.00$ 65,600.00 6BRemove Existing Concrete PavementSY5317027744544600$ 10.00$ 6,000.00 7BInstall Asphalt PavementSY2918247175$ 40.00$ 3,000.00 8B4" Thick Concrete SidewalkSY3774746756308310$ 5.00$ 1,550.00 9B6" Class C Reinforced Concrete DriveSY2303403405351,4451,500$ 35.00$ 52,500.00 10B6" Integral CurbLF3658408508401,1103504,3554,400$ 5.00$ 22,000.00 11B8" Thick Reinforced Concrete PavementSY1,2252,4452,4452,3902,16561511,28511,290$ 45.00$ 508,050.00 12BLimed and Compacted SubgradeSY1,3052,6102,6102,3652,36065011,90011,900$ 2.00$ 23,800.00 13BHydrated Lime (30 lbs/SY)TN203939353510179180$ 110.00$ 19,800.00 14BGrass Seeding by HydromulchLS111$ 10,000.00$ 10,000.00 15BRemove and Relocate Mail BoxEA3212088$ 500.00$ 4,000.00 16BRemove and Relocate Traffic SignEA314441616$ 500.00$ 8,000.00 GRADING & PAVING SUBTOTAL$ 875,300.00 720 $ 131,300.00 +/- 15% CONTINGENCY TOTAL$ 1,006,600.00 C:\DOCUME~1\radloo\LOCALS~1\Temp\XPgrpwise\2008-10-30 AVO24732 Cost Estimate.xlsPage 1