ST8804-CS 891121P Jerry Parch Consulting Engineers November 21, 1989 Mr. Jim Street Weir Bros., Inc. 16475 Dallas Parkway Suite 350 Dallas, Texas 75248 214/931-0650 RE: JP No. 88009; NOTICE TO PROCEED; Fill in Tract 7; Parks of Coppell; Coppell, Texas Dear Jim: Enclosed is an executed copy of your contract with ABQ Development Corporation for Parks of Coppell - Fill in Tract 7. Also provided herewith are two additional sets of Construction Plans for this contract. Current plans for the project construction, as attached and as provided to Weir Bros., Inc. with a copy of my letter to Mr. Dale Jackson of the City of Coppell dated November 16, 1989, include revisions from the plans as bid. The borrow area grading has been revised to generate only 34,500 c.y. of material, all of which will be placed in Tract 7. A "stockpile topsoil area" is shown on Sheet No. 29 and Sheet No. 31 is added to clarify proposed grading adjacent to the east property line of the borrow area. Please furnish executed Performance and Payment Bonds as required by the contract. Blank copies of these instruments as published by EJCDC are enclosed. Also furnish Power of Attorney from the Bonding Company. This letter will serve as your Notice to Proceed on the referenced contract. The Contract time will commence on November 28, 1989. Contract time is thirty calendar days. It is very important that all work under this contract be completed within the Contract time. The Contract completion date is December 27, 1989. Before you start any work at the site, executed copies of the performance and payment bonds must be delivered to Jerry Parche' Consulting Engineers. 320 gVestway Place, Suite 501 · Arlington, Texas 76018 · Metro (817) 467-2418 · (817) 465-0259 Mr. Jim Street November 21, 1989 JP No. 88009 Page 2 of 2 Any questions regarding the construction should be directed to me, the surveyors, or the geotechnical engineers. Brittain & Crawford will provide survey services in accordance with Section F, Paragraph 15 of the Contract. Their phone number is 817/429- 5112. Baker-Shiflett, Inc. will provide geotechnical testing services and general supervision of grading operations in accordance with Section F, Paragraph 23 and other applicable sections of the Contract. Their phone number is 817/478-8254. The soils technician must be present on the site during any fill operations to perform density tests. I am looking forward to working with Weir Bros., Inc. on this project. Please call if you have any questions. Sincerely, JP:ch cc: Mr. Jay Chester, P.E./ABQ Development Corporation Mr. Larry Davis/City of Coppell Mr. Jack Crawford, R.P.L.S./Brittain & Crawford Mr. Roy Grant/Baker-Shiflett, Inc. Mr. Harry Hargrave/Parks of Coppell Joint Venture Mr. Mike Allen/Univest Development Company Mr. Bill Anderson, P.E./Dan M. Dowdey & Associates