Loading...
ST0701-CS081203 Page 1 of 1 Keith Marvin - Southwestern Boulevard From:   "Littleton, Dave" <dlittleton@halff.com> To:   "Keith Marvin" <kmarvin@ci.coppell.tx.us> Date:   12/3/2008 4:24 PM Subject:   Southwestern Boulevard CC:"Ken Griffin" <KGRIFFIN@ci.coppell.tx.us>, "Matt Oyen" <MattO@PacTrust.com>, "Ben Chessar" <BenC@PacTrust.com>, "Rodriguez, Jorge" <jrodriguez@halff.com>,     "Shipman, Cory" <CShipman@Halff.com> Attachments:25816 Bid-Quantities-41'b-b-11-19-2008.xls; 25816 Bid-Quantities-10-30-2008.xls; 25816 Bid-Quantities-37'b-b-11-19-2008.xls; 2008-11-19 AVO24732 41' b-b.xls; 2008-     10-30 AVO24732 Cost Estimate.xls; 2008-11-19 AVO24732 37' b-b.xls; Bridge ESTIMATE - 11-19-2008.XLS   Keith, we have looked at the possibilities for reworking the project by narrowing the roadway and constructing the bridge in phases allowing maintenance of traffic on the existing roadway and bridge.  We have developed construction cost estimates for the revised pavement width (41-foot and 37-foot back to back) and an estimate for staging the bridge construction.   In order to accomplish the design changes requested, without modifying the current alignment, we have identified the following design fees:   Grapevine Creek to Belt Line Road -  Basic Plan Modification - $27,500 Redesign Storm Line B from Approx. Station 5+00 to end (including associated 24-inch Water Line crossings) - $7,500   Coppell Road to Grapevine Creek - Basic Plan Modification - $24,000 Bridge Plan Modification (first structure) - $12,500 Second Bridge Plan (structure after demolition) - $30,000 Sequencing Schematic and description - $5,000   This effort will take approximately 6 weeks to accomplish.   As noted in the estimates, we anticipate saving approximately $160,000 in the roadway costs by reducing the width from 45-feet wide to 37-feet wide.  The bridge costs are estimated to increase by approximately 50% due to the sequencing and staging of the construction.  Note that the construction time will also increase.   I would be happy to come by at your convenience and discuss the various issues associated with the project re- design.  Please let me know that you receive this message.  Thanks!     B. David Littleton, P.E. Vice President   HALFF ASSOCIATES, INC.   1201 N. Bowser Road Richardson, Texas 75081 Phone 214-346-6200 Fax 214-739-0095 www.halff.com   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4936B2A6City_...8/30/2011