Loading...
ST0701-CS090508 (8/30/2011) Keith Marvin - Fwd: RE: Southwestern Blvd.Page 1 From: Keith Marvin To:BenC@PacTrust.com; Griffin, Ken CC:Littleton, Dave Date: 5/8/2009 11:10 AM Subject: Fwd: RE: Southwestern Blvd. I spoke with Dave Littleton at Halff Associates Yesterday. At this point we are waiting on the CISD owned fiber to be moved off the poles on the south side of Southwestern. I won't bore you with the details, but I believe they will be ready to move in the next few weeks. As far as the documents go, I believe the plans can go the way they are. I also went over some issues with the bidding documents with Dave. Specific concerns were as follows: 1. The payment of interest on contractor pay requests can not be reimbursed by the city. (Sec. 7.2 p. 5) Our typical documents state that it is simply not chargeable. 2. The city will need copies of record drawings, both electronic and paper for both sections of the project. (sec. 1.6 p. 11) 3. The bridge shall be open to traffic for the duration of the contract. (sec. 3.10.4 p. 15) 4. The city will require a 2 year, 50% maintenance bond with the term commencing upon final acceptance of the project. This will be for all public infrastructure. (sec. 4.2 p. 19) 5. Claims of additional time generally require the submission of a critical path schedule that shows the delay affects the critical path of the project. (sec. 4.3.7 p. 21) I think we should plan for this construction to begin on or after June 8, 2009. This is the Monday after school lets out for the year. Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> Ken Griffin 5/8/2009 8:23 AM >>> Any update? ken g >>> "Ben Chessar" <BenC@PacTrust.com> 5/5/2009 10:27 AM >>> Good morning, Following up on the status of the construction docs. Regards, Benjamin From: Ken Griffin [mailto:kgriffin@ci.coppell.tx.us] Sent: Thursday, March 19, 2009 3:51 PM To: Ben Chessar Cc: Keith Marvin; Dave Littleton Subject: Re: Southwestern Blvd. Ben Sorry for the delay. Currently, most utilities are relocated or in the process, except for a school fiber optic on TXU poles. We are working with the school vendor to obtain a timeline. Revised plans are in and both sections are at 95% complete. I've spent my (8/30/2011) Keith Marvin - Fwd: RE: Southwestern Blvd.Page 2 time trying to go through the AIA documents and match them up with COG standards to try to eliminate any conflicting information and ensure that the final product meets our standards. Keith is out for Spring Break this week, but I'll have him contact you next week to provide a more detailed status of the plans. Sometimes, 95% plans have addressed all issues and the submitting engineer is waiting on the City to agree before they call them 100%. Keith's update will also provide the latest on the utility relocates that I may not be aware of. Ken Griffin, P. E. Director of Engineering & Public Works 972-304-3680 kgriffin@ci.coppell.tx.us >>> "Ben Chessar" <BenC@PacTrust.com> 3/18/2009 7:55 PM >>> Ken, It has been some time since we spoke last. I left more than two messages with Rhonda in your office as well as sent you emails. I would like to think that no news is good news, however, a return phone call or some type of a response from the City of Coppell would be greatly appreciated. Regards, J. Benjamin Chessar PacTrust 15350 SW Sequoia Pkwy., Suite 300 Portland, OR 97224 (Ph) 503.624.6300 (F) 503.624.7755