ST0701-CN090904(8/30/2011) Keith Marvin - RE: Job #5262 RFI Log and Submittal Log Page 1
From: "Matt Oyen" <MattO @PacTrust.com>
To: "Rodriguez, Jorge" <jodriguez @halff.com >, "Keith Marvin" <kmarvin @ci.co...
CC: "Littleton, Dave" <dlittleton @halff.com>
Date: 9/4/2009 10:03 AM
Subject: RE: Job #5262 RFI Log and Submittal Log
The format of the submittal log works for PacTrust, but we need to also
ask them to project future submittals, so that we can all be aware of
what they will have coming down the pipe and the timing needs associated
with the future submittals. I will defer to both of you on any
additional changes that we may need to coordinate with Lacy on regarding
the proposed RFI and submittal logs.
Thanks,
Matt
- - - -- Original Message---- -
From: Rodriguez, Jorge [mailto:jrodriguez @halff.com]
Sent: Friday, September 04, 2009 6:44 AM
To: Keith Marvin; Matt Oyen
Cc: Littleton, Dave
Subject: FW: Job #5262 RFI Log and Submittal Log
Keith
Here is the log that the contractor proposes.
thanks
Jorge
From: Harris, Miranda [mailto:mharris @lhlacy.com]
Sent: Thursday, September 03, 2009 4:29 PM
To: Rodriguez, Jorge
Cc: Matt Oyen; Harris, Kody
Subject: Job #5262 RFI Log and Submittal Log
Please let me know if you have any questions.
Thank you,
(8/30/2011) Keith Marvin - RE: Job #5262 RFI Log and Submittal Log Page 2
Miranda Harris
LH LACY COMPANY
1880 Crown Rd.
Dallas TX 75234
Office: 214- 357 -0146
Fax: 214- 350 -0662
Privileged /Confidential Information may be contained in this message. If
you are not the addressee indicated in this message, have received this
message in error (or responsible for delivery of the message to such
person), you may not copy or deliver this message to anyone.
In such case, you should destroy this message and kindly notify the
sender by reply email. Please advise immediately if you or your employer
do not consent to Internet email for messages of this kind. Opinions,
conclusions and other information in this message that do not relate to
the official business of our firm shall be understood as neither given
nor endorsed by it.
L. H. LACY COMPANY. Ltd.
Showing: Ali Include Closed Jobs: No
5262 SWern Blvd (SCoppell- Seltline)
Number Rev Description Received From
1 0 Concrete Mix Design for Hand E W I
Placement Paving
2 0 Concrete Mix Design for E W I
Machine Paving
3 0 Concrete Mix Design for Ashlar Ashlar Contracting Company
Contracting
4 0 PVC Water Pipe Ferguson Water Works
5 0 Tracer Wire Ferguson Water Works
6 0 Pipe Lure Ferguson Water Works
7 0 Tapping Sleeves Ferguson Water Works
8 0 Gate Valves Ferguson Water Works
9 0 Hydrants Ferguson Water Works
10 0 Ductile Iron Fittings Ferguson Water Works
11 0 Mega Lugs Ferguson Water Works
12 0 Air Release Material Ferguson Water Works
13 0 Sanitary Sewer Manhole Ring Ferguson Water Works
and Cover
14 0 Water Service Material Ferguson Water Works
15 0 Sewer Pipe Ferguson Water Works
16 0 Sewer Fittings Ferguson Water Works
17 0 PVC Conduit Ferguson Water Works
18 0 Storm Ring and Cover Ferguson 4later Works
19 0 Reinforced Concrete Culvert, Ferguson Water Works
Storm Drain and Sewer Pipe
20 0 Precast Reinforced Concrete Hanson Pipe s Products, Inc.
Manhole Sections
21 0 A Copy of Approved Traffic L.H. Lacy Company
Control Plans
22 0 Storm Drain Embedment Stone Big City Crushed Concrete, L.P
23 0 RCCP Water Pipe and Fittings Hanson Pipe 6 Products, Inc.
24 0 Flexicore of Texas Prestressed Ashlar Contracting Company
Concrete Slab Beam Shop
Drawings
25 0 Mix Designs- Concrete Storm Lattimore Materials Company
Drain Structures
Submittal Log with Detail
Received Received Sent
Due Date Date Date
08 -14 -2009 08 -17 -2009
08 -14 -2009 08 -17 -2009
08 -12 -2009 08 -17 -2009
08 -12 -2009 08 -17 -2009
08 -12 -2009 08 -17 -2009
08 -12 -2009 08 -17 -2009
08 -12 -2009 08 -17 -2009
08 -12 -2009 08 -17 -2009
08 -12 -2009 08 -17 -2009
08 -12 -2009 08 -17 -2009
06 -12 -2009 08 -17 -2009
08 -12 -2009 08 -17 -2009
08 -12 -2009 08 -17 -2009
08 -12 -2009 08 -17 -2009
08 -12 -2009 08 -17 -2009
08 -12 -2009 08 -17 -2009
08 -12 -2009 08 -17 -2009
08 -12 -2009 08 -17 -2009
08 -12 -2009 08 -17 -2009
08 -12 -2009 08 -17 -2009
08 -18 -2009 08 -18 -2009
08 -20 -2009 08 -20 -2009
08 -31 -2009 08 -31 -2009
08 -31 -2009 08 -31 -2009
09 -02 -2009 09 -02 -2009
Returned Returned Forwarded
Due Date Date Date
08 -27 -2009 08 -28 -2009
08 -27 -2009 08 -28 -2009
08 -27 -2009 08 -28 -2009
08 -27 -2009 08 -28 -2009
08 -27 -2009 08 -28 -2009
08 -27 -2009 08 -28 -2009
08 -27 -2009 08 -2B -2009
08 -27 -2009 08 -28 -2009
08 -27 -2009 08 -28 -2009
08 -27 -2009 08 -28 -2009
08 -27 -2009 08 -28 -2009
08 -27 -2009 06 -28 -2009
08 -27 -2009 08 -28 -2009
08 -27 -2009 08 -28 -2009
08 -27 -2009 08 -28 -2009
08 -27 -2009 08 -28 -2009
Status
Approved
Approved
Approved as noted
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved as noted
Approved
Approved
Approved as noted
08 -27 -2009 08 -28 -2009 Approved as noted
08 -27 -2009 08 -28 -2009 Approved
08 -27 -2009 08 -28 -2009 Approved
08 -27 -2009 08 -28 -2009 Approved
08 -27 -2009 08 -28 -2009 Approved
09 -03 -2009 Page 1
Project Manager:
Remarks
Please clarify Mix Designs
Approved with internal chimney
seal with extension precast
Sewer Fittings Shall be SIR 26
heavy wall sewer fittings for
depth > than 10ft and SIR 35
<10 ft
Clarify Cleanout Casting is
attached to this submittal
L. H. LACY
COMPANY. Ltd.
RFI Log with Detail
Showing:
All
Include Closed Jobs: No
5262
SWern Blvd (SCOppell- Beltline)
Spec.
Change Schedule Cost
Number
Date
Subject
Received From
Drawinq Section
Reques Impact impact
1
08 -17 -2009
Alternate Temporary Crash
Ashlar Contracting
Company
Cushion
2
08 -26 -2009
Possible Conflict Abutment 114
Ashlar Contracting
Company
2A Yes
with Existing 24" Water Main
8 -27 -2009: 2B
Yes 8 -27 -2009
3
08 -26 -2009
TXDOT 2004 Standard Spec,
Ashlar Contracting
Company
416.3 -C
09 -02 -2009 Page 1
Project Manager:
Required Returned Forwarded
Status Date Date Date
Approved as Noted 08 -21 -2009 08 -21 -2009
Approved as Noted 08 -27 -2009 08 -28 -2009
Approved as Noted 08 -27 -2009 08 -27 -2009 08 -28 -2009